What is Program Control Instruction

A program control type of instruction, when implemented, may change the address value in the program counter and cause the flow of control to be altered.  In other words, program control instructions specify conditions for changing the content of the program counter, while data transfer and manipulation instructions state conditions of data-processing operations.

 


Related Discussions:- What is program control instruction

Calculate the peak manning and average rate of software, Q. A software proj...

Q. A software project is planned to cost 95PY in a period of 1 year and 9 months. Calculate the peak manning and average rate of software them build up. Ans. Software project

Explain about data coupling, Q. Explain about Data coupling? The depend...

Q. Explain about Data coupling? The dependency among module A and B is said to be data coupled if their dependency is based on the fact they communicate by merely passing of da

Determine the boundary value analysis, What is a boundary value analysis? ...

What is a boundary value analysis? A boundary value analysis is a testing procedure by which the elements at the edge of the domain are selected and tested. It is a test case d

Explain sci, What is SCI? Software Configuration Item is information th...

What is SCI? Software Configuration Item is information that is carried as part of the software engineering process.

What is recovery testing and security testing, What is recovery testing and...

What is recovery testing and Security testing  Recovery testing is system tests that bind the software to fail in a variety of ways and justify that recovery is correctly perf

Write short note on the various estimation techniques, Write short note on ...

Write short note on the various estimation techniques. Algorithmic cost modelling - the cost estimation is depend on the size of the software. Expert judgement - The experts fr

Illustrate iterative waterfall model, Iterative waterfall model The ite...

Iterative waterfall model The iterative waterfall model is as shown in the following figure. Requirement gathering phase in which all needs are identified. The design

State the working of spiral model, State the working of spiral model In...

State the working of spiral model In spiral model, after every phase a review is performed regarding all products developed up to that point and plans are developed for the sub

SRS, What are the advantage and disadvantage of SRS?

What are the advantage and disadvantage of SRS?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd