Q. What is Control coupling?
Control coupling: Module A as well as B are said to be control coupled if they communicate by passing of control information. This is typically accomplished by means of flags that are set by one module and reacted upon by the dependent module.
The term "performance testing" is usually used synonymously with stress testing, load testing, reliability testing, and volume testing. It is a part of system testing, but it's als
Q. Classes of data items in a data dictionary? There are three classes of data items in a data dictionary 1) Data element- It is the smallest unit of data that cannot be me
What are the task involved in design process of SDLC General tasks involved in the design process are the following: i) Design various blocks for overall system processes.
Describe the various steps of the reuse-oriented model. The reuse-oriented model, also known as reuse-oriented development (ROD), is a method of software development in which
Explain in detail about Black box testing. Black box or behavioural testing focuses on the functional needs of the software. It is applied during the last stage of testing.
What are the characteristics of Software Software is engineered or formed; it is not manufactured in the classical sense. Software doesn't wear out. Although the indu
State about the Normal data- Test data - This is data which is valid/acceptable and has expected outcomes (for instance, if a date is being input the day must be in the rang
The company wants to offer an incentive of free shipping to those customers who have not returned for two months. Create a procedure named PROMO_SHIP_SP that determines who these c
Waterfall is a model of the software development process in which the idea phase, requirements phase, design phase, execution phase, test phase, installation phase, and checkout ph
Question: (a) Show two main approaches to identify risk in a project. (b) John finds that IOE recovers some overheads as oncosts on direct staff costs although others are
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd