What is a footing foundation for a water tower, Civil Engineering

Assignment Help:

A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The clay layer overlies hard rock. Liquid limit of clay is 54%, water content 40.5%, and grain specific gravity is 2.70. The saturated unit weight of dense sand is 18.9 kN/m3. Estimate the ultimate settlement due to consolidation of the clay layer, suppose the site to be flooded.

 


Related Discussions:- What is a footing foundation for a water tower

Explain hydrology and evaporation, Explain Hydrology and Evaporation Hy...

Explain Hydrology and Evaporation Hydrology: Study of the circulation of water in nature.    Evaporation: Water in the liquid state transforms to vapor. Evaporation occurs f

Calculate the total passive earth resistance on the wall, A  retaining wall...

A  retaining wall, 4.5 m high, retains a soil with  c = 2 N/cm 2 ,  φ = 30° and g = 20 kN/m 3 , with horizontal surface level with the top of the wall. The backfill carries a surch

Survey chain, describe gunters chain in survey

describe gunters chain in survey

Define continuity equation, Define Continuity Equation Mass in fluid sy...

Define Continuity Equation Mass in fluid systems is always conserved.   Ρ 1 v 1 = ???? 2 v 2   If the fluid density is the same at both points in the flow, the continui

What is the degree of consolidation, A saturated clay specimen is subjected...

A saturated clay specimen is subjected to a pressure of 240 kN/m 2 . After the lapse of a time, it is determined that the pore pressure in the specimen is 72 kN/m 2 .  What is t

Explain the classification of solid waste, Explain the Classification of So...

Explain the Classification of Solid Waste  Solid waste can be classified in several different ways.  Putrescible waste - Animal and Vegetable waste From Cooking and

Calculate the modulus of elasticity of concrete, Calculate the Modulus of e...

Calculate the Modulus of elasticity of concrete A pre-stressed concrete beam, having a cross-section of 150 mm width and 400 mm depth, is used over a span of 8 m. Straight tend

Calculate the final volume of the compacted soil, 1. 130,000-yd 3 of banke...

1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%.  The final volume of the compacted

Enumerate about the bonded member, Enumerate about the Bonded Member It...

Enumerate about the Bonded Member It is a concrete member in which tendons are bonded to the concrete. They may be directly bonded to the concrete as in the case of pre-tension

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd