Q. What do you mean by Shell and Tube Exchangers?
Shell and tube exchanger piping shall be arranged to provide clearance overhead at both bonnet and channel ends. Piping shall be designed with breakout spools at both bonnet and channel ends to enable removal by overhead lifting equipment. Sufficient space should be provided for the removal of tube bundles from shell and tube heat exchangers for maintenance, inspection or replacement.
Horizontal shell and tube exchangers can be stacked two or three high. If larger exchangers need to be stacked more than two high a structure should be considered with each shell separately supported. The following are rules of thumb for stacking:
• 1.2 m in diameter Stacked three high
• 1.2 to 1.8 m in diameter Stacked two high
• Over 1.8 m in diameter Shall not be stacked
Fixed tube shell exchangers require a clear space for in-situ roding out, or tube replacement. Where removal of tube bundles is specified, space should be provided for a crane or proprietary tube pulling equipment. Check the type of bundle pulling method used by the plant. The bundle removal area should not extend over main plant roads, although plot space can be saved if this is allowed by the Client. Shell and tube exchangers in structures need good access to both channel and rear end and may require lifting beams and lay down areas for channel head removal. This requirement must be checked for, early in the design.
Find stress intensity factor - thick cylinder: A thick cylinder of r i = 10 mm, r 0 = 70 mm carried equal and symmetric radial cracks 6 mm long on opposite sides of inner su
Find out the amount of energy spent: 6 cubic metre of water is to be lifted to a height of 40 metres and delivered having velocity of 4 metres/sec. If this operation takes 12
A cast iron hollow column, having 100mm external diameter and 80mm internal diameter is used as a column of 2.4 m length. Using Rankine formula, calculate the crippling load, when
Major parts of the machine of Radial drilling machine Column The column is cylindrical in shape and built rugged and solid. The column supports the head and the sleeve or
(a) Illustrate Kinematics Links, Chin, Mechanism and Pair with their classification and examples. (b) Compare between structure and Machine.
Prepare a design of close coiled helical compression spring for a service load ranging from 2250 N to 2750 N. The axial deflection of the spring for the load range is 6 mm. Conside
Determine time required to stop the automobile: A 20KN automobile is moving at speed of 70Kmph when brakes are fully applied causing all the four wheels to skid. Determine ti
Find the Laplace transform of the following differential equation: ? +3? +6x = 0, x(0) =0, ?(0)=3 Taking the inverse Laplace transform of X(s), obtain the time solution x(t).
Calculate tension in limbs: Q : A horizontal drum of belt drive carries the belt over semicircle around it. It is rotated counter clockwise to transmit a torque of 300N-m. If
BOILERS: BOILERS : Boilers can be defined as closed pressure vessels that are used to generate steam at pressure much higher than atmospheric pressure by the transfer of he
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd