Q. What do you mean by Shell and Tube Exchangers?
Shell and tube exchanger piping shall be arranged to provide clearance overhead at both bonnet and channel ends. Piping shall be designed with breakout spools at both bonnet and channel ends to enable removal by overhead lifting equipment. Sufficient space should be provided for the removal of tube bundles from shell and tube heat exchangers for maintenance, inspection or replacement.
Horizontal shell and tube exchangers can be stacked two or three high. If larger exchangers need to be stacked more than two high a structure should be considered with each shell separately supported. The following are rules of thumb for stacking:
• 1.2 m in diameter Stacked three high
• 1.2 to 1.8 m in diameter Stacked two high
• Over 1.8 m in diameter Shall not be stacked
Fixed tube shell exchangers require a clear space for in-situ roding out, or tube replacement. Where removal of tube bundles is specified, space should be provided for a crane or proprietary tube pulling equipment. Check the type of bundle pulling method used by the plant. The bundle removal area should not extend over main plant roads, although plot space can be saved if this is allowed by the Client. Shell and tube exchangers in structures need good access to both channel and rear end and may require lifting beams and lay down areas for channel head removal. This requirement must be checked for, early in the design.
Need a basic explanation of how to go about doing a plane strain analysis of a pressure vessel
Differentiate between hot working and cold working process
Transformer for flash butt welding The transformer required for flash butt welding is similar to that needed for other resistance welding processes. Here, the transformer is to
what are the necessity of lubrication ?
What is STEP The STEP (Standard for External Representation of Product Data) project is supported by the ISO workgroup TC 184/SC4. it is also sometimes called Standard for Exch
The following data is provided for belt transmission dynamometer as shown in figure, NA = 400 r.p.m., DA = 750 mm, DB = DC = DD = 250 mm, L = 800mm, Power = 8KW. Determine :- Th
HOW DO I DESIGN A COMPONENT FOR IMPACT STRENGTH FOR IMPACT LOAD AT LOWER TEMPERATURE
State the assumptions in pin joined trusses?
the movability of 3 bar mechanism is zero then how can we comment on instantaneous centre of it?
(i) Use the GOAL SEEK tool in MS EXCEL to solve the following equation and determine the TWO roots of this equation between 0 X 4 -8x 3 -x 2 -14x+21=0 (ii). Use the SOLVER t
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd