Q. What do you mean by Shell and Tube Exchangers?
Shell and tube exchanger piping shall be arranged to provide clearance overhead at both bonnet and channel ends. Piping shall be designed with breakout spools at both bonnet and channel ends to enable removal by overhead lifting equipment. Sufficient space should be provided for the removal of tube bundles from shell and tube heat exchangers for maintenance, inspection or replacement.
Horizontal shell and tube exchangers can be stacked two or three high. If larger exchangers need to be stacked more than two high a structure should be considered with each shell separately supported. The following are rules of thumb for stacking:
• 1.2 m in diameter Stacked three high
• 1.2 to 1.8 m in diameter Stacked two high
• Over 1.8 m in diameter Shall not be stacked
Fixed tube shell exchangers require a clear space for in-situ roding out, or tube replacement. Where removal of tube bundles is specified, space should be provided for a crane or proprietary tube pulling equipment. Check the type of bundle pulling method used by the plant. The bundle removal area should not extend over main plant roads, although plot space can be saved if this is allowed by the Client. Shell and tube exchangers in structures need good access to both channel and rear end and may require lifting beams and lay down areas for channel head removal. This requirement must be checked for, early in the design.
Calculate strength coefficient: A copper specimen of 64 mm gauge length and 12.80 mm dia. was tested in tension. Following two diameters were recorded in the plastic range of
Q. What do you mean by Velocity - Area Method? Out of the above four categories, velocity area method is most widely used and provides more accurate results. Requirements of a
Initial Graphics Exchange Specifications (IGES) The basic concept of IGES is concerned with the exchange of product description data from one CAD system to another one. The CAD
a) Determine the value of σ 0 to cause failure when θ=30°, according to the maximum stress failure criterion. Consider both σ 0 > 0 and σ 0 e.g. "failure in longitudinal tens
With the help of neat diagrams explain various parts of Cupola. Define its operation. How the thermal efficiency of Cupola calculated? What do you mean by Die casting process? G
Pulsed DC Welding Pulsed DC involves the repetitive variation in arc current from a background (low) value to a peak value. Adjustments of the pulse current time, background cu
what is crippling load in column and strut
Objectives: After studying this unit and subsequent practicing, you should be able to acquire the skills required for troubleshooting of a motorcycle and identify different
chip formation
Figure shows a Warren girder consisting of seven members each of 3 m length freely supported at its end points. The girder is loaded at B and C as given. Determine the forces in al
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd