Q. What do you mean by Settlement Cracks?

Settlement cracks normally take place in diagonal position. Sometimes vertical cracks may also take place (Figure (a)). Settlement cracks start from the top bottom or end of the wall. Crack due to differential settlement may take place if the top end of the wall has settled more than the rest of the building.

Cracks developed due to other reasons (not settlement) will be irregular as shown in Figure (b).

Cracks may develop in buildings due to other factors like thermal changes, bad construction, faulty placement of concrete etc.

2196_Settlement Cracks.png


Related Discussions:- What do you mean by settlement cracks

#tiphysics in civil engineering tle.., Ask questapplication of physics in c...

Ask questapplication of physics in civil engineering ion #Minimum 100 words accepted#

Two layered spatial structures, Classification of the damage according to t...

Classification of the damage according to the type of structures   The level of damage in spatial trusses has also been classified into three different levels based on the t

What are the various types of tiles, Q. What are the various types of tiles...

Q. What are the various types of tiles available in the market for floors and walls? What basic precautions would you take for their laying and choosing the type, colour and siz

Sand layer underlying paving slab or interlocking blocks, Question What...

Question What is function of a sand layer underlying paving slab or interlocking blocks? Answer Normally after laying of sub-base layer of paving slab or interlocking

Grillage foundation, what are the advantages of grillage foundation and why...

what are the advantages of grillage foundation and why people prefers that?

Hybridisation, Why hybridisation never take in isolated atom

Why hybridisation never take in isolated atom

Determine the loss of fluid energy, Determine the loss of fluid energy as 3...

Determine the loss of fluid energy as 310 gallons per minute (gpm) of water flows through 1,000 ft of 4 inch, schedule-40 welded and seamless steel pipe. The fluid temperature is 5

Bitumen, limitation in using with bitumen as watertight material

limitation in using with bitumen as watertight material

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd