Violation of k-p statement - thermodynamics, Mechanical Engineering

Assignment Help:

Violation of K-P Statement:

A HE produce work 'W' by exchanging the heat with one reservoir at temp. T1 only. The K-P statement is violated.

 

140_Violation of K-P Statement.png

H.P. is extracting heat Q2 from low the temperature (T2) reservoir and discharging heat to the high temperature (T1) reservoir and getting work 'W'. The HE and HP together   constitute m/c working in a cycle and producing sole effect of transmitting heat from lower temperature to higher temperature.


Related Discussions:- Violation of k-p statement - thermodynamics

Force exerted by a jet of water on an inclined fixed plate, (a) Show that t...

(a) Show that the force exerted by a jet of water on an inclined fixed plate in the dissection of jet is provided by fx = .a.v 2 . sin2θ. Where a is area of jet, v is velocity of j

Calculate the shear flow in wall - flange areas, Calculate the shear flow i...

Calculate the shear flow in each wall of the fuselage section below. The flange areas are 1 sq in and the web thicknesses are 0.05 in. The material has modulus E = 10 mpsi and G =

Lifting machine, all information about lifting machine

all information about lifting machine

Cranes, Cranes are used to move materials vertically and laterally in ...

Cranes are used to move materials vertically and laterally in ain area of limited length. They may he operated hydraulically pneumatically or electrically the important ty

IDE101, Polygon law of forces

Polygon law of forces

Principle stresses, Determine the bending  (o-, ) and shear stress ( Tx), )...

Determine the bending  (o-, ) and shear stress ( Tx), ) at the surface element shown on the solid circular shaft below. Use Mohr's circle to determine the principle stresses, a l

Explain index jig, Explain Index Jig? 1. This type of jig, as the...

Explain Index Jig? 1. This type of jig, as the name suggests, incorporate a suitable indexing mechanism, by means of which the work piece can be indexed to required posit

Quality control specialist, At site locations, the WorleyParsons QC Special...

At site locations, the WorleyParsons QC Specialist (QCS) is responsible to verify that the requirements for PMI as specified in the purchase order/subcontract documents are impleme

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd