Q. Surface Preparation and Coating?

Vendor shall chemically clean all foreign material and commercially sandblast (SSPC-SP-10) mill scale and rust from all surfaces to be painted.
Vendor shall use a zinc rich primer on all piping and steel operating below 200oF (93oC).

All parts operating above 200oF (93oC) are to have one coat of high temperature (silicon) aluminum paint applied according to paint manufacturer instructions.


Related Discussions:- Surface preparation and coating

Formula to make a parallelogram a rectangle, I need a formula to calculate ...

I need a formula to calculate the offset that would give me

Corrosion - erosion allowance, Q. Corrosion - Erosion Allowance? The re...

Q. Corrosion - Erosion Allowance? The required design life shall be based on written agreement between the user and the Engineering Contractor. Allowance specified shall be ba

Disc clutch friction warpage-clutch jerking, Disc clutch friction warpage: ...

Disc clutch friction warpage: Place the disc clutch friction on the surface plate and check for warpage.

Explain the machining processes, Machining Processes In machining proce...

Machining Processes In machining processes, also known as Metal cutting or chip forming processes, material is removed from a work piece to get the final shape of the product.

Mockup test, we perform mockup test to 10 tube with tubesheet. please give ...

we perform mockup test to 10 tube with tubesheet. please give the cutting plan?

Compaction-manufacturing methods of ceramics, Compaction This is carri...

Compaction This is carried out in several manners that might occupy the addition of a binder or lubricant and application of pressure. Sintering is densification of assembled

Heavy traffic areas in pumps, Q. Heavy traffic areas in pumps? These ar...

Q. Heavy traffic areas in pumps? These are areas around pumps, filters, control valves, PSV's and other equipment requiring frequent maintenance or servicing. Piping attache

Evaluate mechanical work - thermodynamics, Evaluate mechanical work in diff...

Evaluate mechanical work in different steady flow process: Work done by steady flow process   and work done in non flow process,   1. Constant Volume Process; W 1-2 = V

Impact testing, Charpy impact tests, when required shall comply. Impact ...

Charpy impact tests, when required shall comply. Impact tests shall be conducted at the minimum design metal temperature or at a lower temperature and shall meet or exceed energ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd