Steps to determine brake (bhp) and motor horsepower (mhp), Civil Engineering

Assignment Help:

Steps to determine the brake (bhp) and motor horsepower (mhp): 

1) Determine water horsepower (whp).

hA (Qgpm) (SG) / 3956 OR hA (Qcfs) (SG) / 8.814

2) Apply the pump efficiency given in the problem into the brake horsepower equation along with the whp to determine bhp.

 bhp = (whp/pump efficiency)

pump efficiency = (whp/bhp) 100

3) Apply the motor efficiency given in the problem into the motor horsepower equation along with the bhp to determine mhp. 

 mhp = (bhp/motor efficiency)

motor efficiency = (bhp/mhp) 100


Related Discussions:- Steps to determine brake (bhp) and motor horsepower (mhp)

Understanding civil main things, i want to just understand civil eng main p...

i want to just understand civil eng main points of all subjects which i becam able to tell some body about this tha what is this ?

Civil engineering drawing, Explain step by step procedure involved in the a...

Explain step by step procedure involved in the analysis and design of balanced cantilever bridge.

Show the stresses during pile driving, Q. Show the Stresses during pile dri...

Q. Show the Stresses during pile driving? Stresses during pile driving In pile driving operation, proper selection of piling hammers is necessary to prevent the damage of

Marked., who invented the first LA abrasion test machine

who invented the first LA abrasion test machine

Explain the permissible settlement, Q. Explain the Permissible Settlement? ...

Q. Explain the Permissible Settlement? Any foundation may fail in shear or by excessive settlement. The failure due to shear is checked by adopting safe value of bearing capa

Illustrate the concept of load balancing, Concept of load balancing In ...

Concept of load balancing In above cases of concentric and eccentric pre-stressing, straight tendon profiles (or tendon shapes) along the beam span have been considered. If a t

Kings of the world, i want to know more about civil engineering

i want to know more about civil engineering

Environment engineering assignment, Estimate the ground level NO concentrat...

Estimate the ground level NO concentration: a. Directly downwind at a distance of 2 km b. At the point downwind where NO is maximum c. At a point located 2 km downwind and 0.1 km

Binder, Binder: Normally 60/70 penetration grade, and provides cohesio...

Binder: Normally 60/70 penetration grade, and provides cohesion to the mixture and increases its stability. The mix design is done by the Marshall test, in which a specimen

Frction, Ask question laws of sollid friction #Minimum 100 words accepted#

Ask question laws of sollid friction #Minimum 100 words accepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd