The following steps are taken to decarbonise the engine :

Remove the exhaust muffler.

  • Disconnect the spark plug.
  • Remove the intake pipe bolt.
  • Loosen the bolt detaching the left side cover from the cylinder head.
  • Remove the bolt and left side cover.
  • Remove the gearshift pedal.
  • Remove the left crankcase cover.
  • Rotate the generator rotor counterclockwise and align the "T" mark on the generator rotor with the index mark on the left crankcase.
  • Make sure that the "O" mark on the cam sprocket is aligned with the index mark on the cylinder head cover.
  • Remove the cam sprocket bolts.
  • Remove the cam chain by lifting it up with the screw driver.
  • Remove the cam sprocket.
  • Remove the cylinder head nuts.
  • Remove the cylinder head cover.
  • Remove the 6mm bolt attaching the cylinder head and cylinder.
  • Remove the cylinder head.
  • Remove the spark plug.
  • Check the spark plug for cracks at the outer and inner insulator.
  • Remove the valve adjuster hole caps.
  • Remove the bolts and the cylinder head right side cover.
  • Screw an 8 mm bolt to the rocker arm shaft and pull out each rocker arm shaft.
  • Remove the rocker arm.
  • Remove the cam shaft.
  • Compress the valve spring compressor and remove the retainer, valve spring and valve.
  • Remove the carbon deposits from the combustion chamber.
  • Remove any gasket material from the contact face of the cylinder head.
  • Clean both intake and exhaust valves thoroughly to remove carbon deposits.
  • Apply a light coating of valve grinding paste to each valve face. Lap each valve and seat using a rubber hose or other hand-lapping tools.
  • Remove the valve and inspect the face.
  • Measure the valve seat.

 


Related Discussions:- Steps for decarbonise the engine

Surveying.., what is the two purposes of surveying

what is the two purposes of surveying

Design square footing with plan area and soil reaction, A square column 410...

A square column 410 x 410 mm (along with 4 No. 16 mm bars) carries a dead load of 1020 kN and an imposed load of 410 kN. The foundation soil has a safe bearing capacity of 200 kPa.

Heat loss in cylindruical pipe, Explain which laws of physics are used to d...

Explain which laws of physics are used to discuss heat loss in a pipe, and briefly explain how the famous equation for the loss of heat in a cylindrical pipe is derived. Explain th

COMPRESSOR PROBLEM FROM CUSTOMER, OUR CUSTOMER HAD APROBLEM WITH OUR CUSTO...

OUR CUSTOMER HAD APROBLEM WITH OUR CUSTOMER ,AND ME AS AMECHANICLAL ENGINEER FOUND THE PROBLEM

Types of tool and equipment , TYPES OF TOOL AND EQUIPMENT: We can classify...

TYPES OF TOOL AND EQUIPMENT: We can classify the required tools and equipment into following four categories to understand their uses : General tools, Measuring equipm

Estimating time, estimating time of boring, turning,milling?

estimating time of boring, turning,milling?

Explain the application of electro chemical machining, Explain the Applicat...

Explain the Application of Electro Chemical Machining? 1. EBM has been used to perforate holes in glass fiber spinning head made from a heat resistant supper alloy. 2. Slott

Design pressure of vessels, Q. Design pressure of Vessels? The design p...

Q. Design pressure of Vessels? The design pressure shall be as specified on the Vessel Data Sheet. The design pressure for a vessel in vacuum service shall be full vacuum (1

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd