Step for construction of string diagram, Operation Management

Assignment Help:

Step  for construction of string Diagram

To construct a diagram the  following  steps are required.

1. Step 1 produce a scale map  of the work  area identifying  all machines  furniture and other  equipment  in the diagram  that can be moved. These could  be shaped as piece of card that can  be pinned  to the work area  map.

2. Step2: Indentify  the point  in the process where actions  take  place and mark the positions  of  these on the  map with  map pins  and action symbols.

3. Step:3: Tie  the end  of  piece  of string to the pen wheel the process starts  and then wrap  it  around  each pen in turn following the movement around the process.

4. Step 4:  Mark  the string  at the start  and finish  points  using  a pen.

5. Step 5: Measuring  between the pen  marks  will give the total  distance travelled during  the process.

6. Step 6: Rearrange the movable items  on the  map aiming to reduce the total  distance.

The objectives  of marking  out a string  diagram are three fold:

a.  To control  backtracking,

b.  To reduce excessive travel,

c. To bring  out  points  of traffic congestion,


Related Discussions:- Step for construction of string diagram

Explain step of customer needs and expectations, Beginning with the step of...

Beginning with the step of customer needs and expectations (expected quality), identify and describe the remaining steps in the customer-driven quality life cycle. (Hint: drawing a

Determine the feasible solution of transportation problem, A firm owns faci...

A firm owns facilities at six places. It has manufacturing plants at places A B and C with daily production of 50, 40 and 60 units respectively. At points E, E and F it has three w

Explain the probable destiny competing products, Consider this: Lee Peterso...

Consider this: Lee Peterson has invented a new product that detects water leaks due to broken pipes and sends out an alarm similar to a smoke alarm. However, Lee has very little pe

Explain trend-adjusted exponential smoothing model, After plotting demand f...

After plotting demand for four periods, an emergency room manager has concluded that a trend-adjusted exponential smoothing model is appropriate to predict future demand. The initi

Planning tools or techniques, Planning Tools or Techniques General Fra...

Planning Tools or Techniques General Framework Discuss the Planning function in the context of the work of the manager.  Illustrate with a case study. Individual Compone

Operation strategy for globaltel in Asia, write a list of elements that sho...

write a list of elements that should be included in an operations strategy for global tel

Calculating idle time and itilization, How do I calculate idle time and uti...

How do I calculate idle time and utilization in a two=stage processing problem?

Explain terminals and arrive at a message concentrator, Messages are transm...

Messages are transmitted from low speed terminals and arrive at a message concentrator at a Poisson rate of 600/hr. They are held in a buffer until a hi-speed trunk line is free to

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd