Standards used for development of a system, Computer Engineering

Assignment Help:

Q. Standards used for development of a system?

Documentation standards: It must be an ongoing activity at the time of system development life cycle. 

Quality Standards: Checks must be established at each phase for ensuring that the output of each phase meets technology and business expectations.

Automated Tool standards: Software and hardware platforms must be finalized for the development of Information system. Automated tool standards recommend technology that would be used to develop and maintain information systems and to ensure completeness, consistency as well as quality.


Related Discussions:- Standards used for development of a system

What are the exceptions encountered for fp operation, What are the exceptio...

What are the exceptions encountered for FP operation? The exceptions encountered for FP operation are overflow, underflow. /0, inexact and invalid values.

A full binary tree with ''n'' non-leaf nodes, A full binary tree with 'n' n...

A full binary tree with 'n' non-leaf nodes have  2n+l nodes.

Explain busy hour call attempts in telephone traffic, With reference to tel...

With reference to telephone traffic, explain the terms BHCA. BHCA: The number of call attempts in the busy hour is termed as busy hour call attempts (BHCA) that is an importa

Buses - computer architecture, Buses: Execution of 1 instruction ne...

Buses: Execution of 1 instruction need the following 3 steps to be performed by the CPU: I.  Fetch the contents of the memory location pointed at by the computer syst

Find max conversion time of 6-bit dual slope A/D converter, A 6-bit Dual Sl...

A 6-bit Dual Slope A/D converter uses a reference of -6V and a 1 MHz clock. It uses a fixed count of 40 (101000). Find Maximum Conversion Time.         Ans. The time T 1 specifie

What is the future in mq if i have 2+exp, It speeds execution of distribute...

It speeds execution of distributed applications. It runs on dissimilar platforms. It time independent. No loss for msg delivery i.e. guarantee delivery.

Linq file extension, What is the LINQ file extension that interacts with Co...

What is the LINQ file extension that interacts with Code Behind objects. Ans) its .dbml

What is visibility give uml notation, What is visibility give UML notation?...

What is visibility give UML notation? Visibility refers to the ability of a process to reference a feature from another class and has possible valued of public, private, protec

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd