Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Specification of Wood work for Door?
1. General - Timber for door, window and ventilators frames shall be as specified. Timber shall be sawn in the direction of the grains. All member of a frame shall be of the same species of timber and shall be straight without any warp or bow. Frames shall have smooth, well-planed (wrought) surfaces the depth of the rebate for housing the shutter shall be 15 mm, and the width of the rebate shall be equal to the thickness of the shutters. A tolerance of ± 3 mm and 2 mm shall be permitted in the speci¬fied finished dimensions of timber sections in frames.
2. Joints - The frames shall have dovetail joints. The Jamb post shall be through tenoned into the mortise of the transoms to the full thickness of the transoms and the thickness of the tenon shall be not less than 2.5 cm. The tenons shall closely fit into the mortise without any wedging or filling. The contact surface of tenon and mortise before putting together shall be glued with polyvinyl acetate dispersion based adhesive and pinned with 10 mm dia hard wood dowels, or bomboo pins or star shaped metal pins. The joints shall be at right angles when checked from the inside surfaces of the respective members. The joints shall be pressed in position.
3. Fixing of frames - The frames shall be got inspected and approved by the Enginee-in-Charge before being painted, The surface of the frames abutting masonry or concrete and the portions of the frames embedded in floors shall be given a coating of coal tar. Frames shall be fixed to the abutting masonry or concrete with minimum of three holdfasts or metallic fastners as specified.
4. Measurements - Wood work wrought, framed and fixed shall be measured for finished dimension without any allowance for the wastage or for dimensions beyond specified dimension without any allowance for the wastage or for dimensions beyond specified dimensions.
Light-weight Aggregate Prestressed Concrete The use of light-weight aggregate concrete for prestressed concrete construction is well established. The main advantage of light-
The material that have lowest resistivity is Answer: Silver is the material
how to reduce plane table errors
Tension Members: You have learnt about the Standard specification for structural steel and various types of structural steel rolled sections. Different types of loads, stresse
Define Non-destructive inspection of Concrete Substructures? If there is evidence of significant deterioration, then a Level III inspection, involving either non-destructive or
Q. Design a water supply scheme for new Railway colony based on the following data's. i. Requirement of Loco and domestic consumption 5 lacs gallon per day. ii. Source of wat
Soil Classification: Based on particle size, the soils can be classified as under, adopting the IS soil classification system: 0.002 0.075 0.425 2.36 4.75
we need solution manual
how to calculate carbon intensity?
Hoyers long line system pre-tensioning When concrete attains the required strength, jacks are released and tendon wires in-between various units are cut.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd