Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Simple Rules
FIFO (first in first out) PNj = taj
SPT (shortest processing time) PNj = oj
ODD (earliest operation due dates) PNj = tdj
EDD (earliest job due date) PNj = tdj *
SL (slack) PNj = tdj* - t - wj* * = tsj *
CR (critical ratio) PNj = (tdj - t) / (tdj - tdj - oj)
SL/OPN (slack per remaining operation) PNj = tsj / nj*
SL/RPT (slack/remaining processing time) PNj = tsj / wj*
Discuss the method of properties, manufacturing and applications of following cutting tool materials: (i) Carbides (ii) Ceramics (iii) Cubic Boron Nitride (CBN) What ar
Bund / dike capacity is typically covered by local codes and regulations, however some general principles for liquid storage compounds are: • The net capacity of a bunded / dik
(a) List several advantages and disadvantages of using transparent polymeric materials for eyeglass lenses. (b) Cite four properties (in addition to being transparent) that are
Q. Describe Polythionic Acid Corrosion? Although it is not typically thought of as high temperature corrosion, polythionic acid stress corrosion cracking occurs in areas where
definition of open and cross belt drive
dynamic balancing machine
A pull up door is stuck in the closed position. A strap, fastened on the inside bottom and located at the center of the door is pulled outward at an angle of 45 deg above horizonta
A triangle PQR with vertices P(2,1), Q(4,4) , R(1,3) is to be translated by 2 units in x - direction and 4 units in y direction. Using the homogenous coordinate system, calculate t
Calculate the critical crack length: A wide plate of mild steel is subjected to uniform tensile load causing a stress of 100 MPa. Calculate the critical crack length in the ce
Q. Show Leak Area Preparation? Clearly mark the location of the leak on the flange with a permanent marker. Notes: 1. Depressurizing hydrocarbon lines in non-emergency event
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd