Show the direction of gunning in shotcreting, Civil Engineering

Assignment Help:

Q. Show the Direction of gunning in shotcreting?

At the time of the construction of shotcrete, it is intended at gunning the full thickness in one single operation and this helps to decrease the occurrence of possible delamination and formation of planes of weakness. Furthermore nozzles must be held about 0.6m to 1.8m from the surface and normal to the receiving surface. Reason of gunning perpendicular to receiving surface is to avoid the possible rebound and rolling resulting from gunning at an angle deviated from the perpendicular. Rolled shotcrete creates a non-uniform surface that serves to trap overspray and shotcrete resulting from the rebounding action. This is undesirable due to the wastage of materials and generation of rough and uneven surface.


Related Discussions:- Show the direction of gunning in shotcreting

Correction for construction period, You are aware that construction of any ...

You are aware that construction of any type of structure takes sometime. Pressure due to the building will be applied gradually and not instantaneously. Excavation for the construc

Proctor test for GSB material, what is the procedure for gsb proctor test f...

what is the procedure for gsb proctor test for matrial sampling for lab density

Explain the aashto classification system, Explain the AASHTO Classification...

Explain the AASHTO Classification System   1.  Identify the percent passing the No.10, No. 40, and No. 200 sieves. Identify the LL and PI of the fraction passing the No. 40 sie

Main purpose of conducting load test for piling works, Question What is...

Question What is main purpose of conducting load test for piling works ? Answer Pile load test gives information on ultimate bearing ability but not settlement be

Properties a water proofing system, Q- Mention 5 essential properties a wat...

Q- Mention 5 essential properties a water proofing system should have? Ans.- water proofing system should have the following essential properties :- a) It should be im

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

Road maintenance, find the details of road maintenance in our project work

find the details of road maintenance in our project work

Important items during level crossing inspection, Q.7.- Write the important...

Q.7.- Write the important items to be inspected during level Crossing inspection. How do you take census of traffic at level crossing. Ans.-Important items to be inspected duri

Construction material, 4. Calculate the loose volume of material needed to ...

4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench

Explain the hydraulic gradient, Explain the Hydraulic Gradient A measur...

Explain the Hydraulic Gradient A measurement of the movement of water over distances. Change in hydraulic head from one monitoring point to another.  i = ΔH/L  units are typ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd