Short-Term Measures for Technical Loss Reduction

The short-term measures involve measures needs for immediate improvement and reduction of losses within the system. These are based upon the information / data readily available along with the utilities. The works proposed under this plan should be based on the sample studies/statistical check/scrutiny of the existing system details.

Short-term Measures for Technical Loss Reduction

  1. Network Reconfiguration
  2. Network Reconductoring
  3. Preventing Leakages at Insulators
  4. Employing AVB (Automatic Voltage Booster)
  5. Distribution Transformers will managed better
  6. Load Balancing and Load Management
  7. Capacitor Installation (Series or Shunt)
  8. Improving Joints and Connections
  9. Laying Additional Link Lines
  10. Increase in HT:LT Ratio
  11. The High Voltage Distribution System Adoption (HVDS)
  12. Daily Maintenance of Distribution Network
  13. Creation of Primary Substation

A combination of one or more of the above measures would have to be taken to bring the losses down to acceptable levels.


Related Discussions:- Short-term measures for technical loss reduction

Ac resistance and dc resistance, Background Information Electrical mach...

Background Information Electrical machines usually consist of copper windings on steel cores, and their AC resistance is greater than their DC resistance. The power loss has

Op-amp amplifier, A voltage signal generated by a sensor conditioning circu...

A voltage signal generated by a sensor conditioning circuit varies from -0.5V to +0.5V . The signal from the sensor is to be connected to the analog to digital  converter which onl

Explain explanatory notes on a/d conversion, Explain explanatory notes on A...

Explain explanatory notes on A/D conversion. The digital inventory is working a revolution into the field of microcontrollers, technology and microprocessors are used more effi

Clampers, what would the change after adding a registor paralelly in clampe...

what would the change after adding a registor paralelly in clampers?

Power system engineering, A three-phase transposed line is composed of one ...

A three-phase transposed line is composed of one ACSR conductor per phase with flat horizontal spacing of 11 meters as shown in Figure (a). The conductors have a diameter of 3.625

What do you mean by signal multipath, Q. What do you mean by Signal multipa...

Q. What do you mean by Signal multipath? Signal multipath occurs with electromagnetic wave propagation via sky wave in the HF range. When the transmitted signal reaches the rec

Purpose of customer review in project management, Q. Purpose of Customer Re...

Q. Purpose of Customer Review in project management? The Customer in conjunction with the Project Manager/ Engineer decides the timing of the IFA review. This review is cond

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd