Rolling - Binder:
The layer thickness is 40-50 mm. Rolling is done in three stages :
Initial Rolling
By 80-100 kN smooth wheeled roller.
Intermediate Rolling
By 80-100 kN vibratory roller or by pneumatic tyred roller.
Final Rolling
60-80 kN tandem roller.
Rolling is done till the laboratory density is achieved.
The maximum dry density and optimum moisture content of a soil from standard proctor's test are 18 kN/m 3 and 16% respectively. Compute the degree of saturation of the sample,
detail methods of underwater concreting
In case of simple bending after simply supported beam, derive that M/I = s /y = E/R.
types of dam
Explain the Erosion and Sedimentation Erosion: Removal of soil or other channel material caused by the rapid movement of water over the channel surface. The removed material
Define the Cost per Square Foot of Contact Area The cost of concrete formwork is influenced by three factors: 1. Initial cost or fabrication cost that contains the cost of t
is the seismic joints like falling joints ? thanks :)
Q. Potential advantages of segmental tunnelling when compared with hand-shield pipe-jacking? In segmental tunnelling, jacks are installed at the shield so that itisn't necessar
manufacture of cement by dry process
Define the Limitations of shock transmission unit? STUs are not intended for energy/shock absorption. They simply transmit load from one part of the structure to another thus s
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd