Purpose of using capping layers in pavement construction, Civil Engineering

Assignment Help:

Q. Purpose of using capping layers in pavement construction?

When California Bearing Ratio of subgrade is checked to be below a specific percentage (for example 5%), a capping layer is generally provided to decrease the effect of weak subgrade on the structural performance of the road. It also provides a working platform for sub-base to be created on top in wet weather condition since the compaction ofwet subgrade is difficult on site. Effect of interruption by wet weather can be decreased significantly and progress of construction works wouldn't be hindered. Most significantly, cost of cappinglayers is low since the material can be readily attained locally.


Related Discussions:- Purpose of using capping layers in pavement construction

Doors and windows, what are the actuall windows and door dimensions e.g AN ...

what are the actuall windows and door dimensions e.g AN ND4

Properties of ordinary portland cement, Properties of Ordinary Portland Cem...

Properties of Ordinary Portland Cement (i) Chemical properties: Portland cement consists chemical compounds are following: (a) Tricalcium silicate          3 CaO.SiO 2 (C

Harbour layout, Harbour Layout: A harbour has the following constitue...

Harbour Layout: A harbour has the following constituent parts: (a)        An entrance channel, 100-300 m wide (b)       A turning basin, dia 400-600 m (c)        A b

Lime, what is stone lime shall lime and kankar lime

what is stone lime shall lime and kankar lime

Define chlorides - underwater inspection of bridge, Define Chlorides - unde...

Define Chlorides - underwater inspection of bridge? Chlorides do not attack plain concrete when present in the concentrations that normally exist in seawater, but may greatly a

RISE AND FALL METHOD, WHAT IS THE PURPOSE OF USING THE RISE AND FALL METHOD...

WHAT IS THE PURPOSE OF USING THE RISE AND FALL METHOD IN LEVELLING?

Calculate the total duration for the four activity project, Calculate the T...

Calculate the Total Duration for the Four Activity Project Solution:      Scheduling work activity has associated time duration. The durations shown in the Table were e

Surveying, earthen dam and gravity dam

earthen dam and gravity dam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd