An operator tells you that it takes 2 minutes for a process to get half way to the final value after a step change in the input. What can you infer about the process time constant (tP)?
Assume dead-time (?P) is negligible and a linear first-order system.

Related Discussions:- Process Control

What are bulk defects, Bulk defects * Voids are little regions where th...

Bulk defects * Voids are little regions where there are no atoms, and can be thought of as clusters of vacancies. * Impurities can cluster jointly to form small regions of a

Dynamics, kenematics of rigid body in rotation

kenematics of rigid body in rotation

The pressure drops, 30,000 lb/hr of combination whose average properties co...

30,000 lb/hr of combination whose average properties correspond to hexane is vaporized from 40,000 lb/hr of feed at its bubble point at 105 psig. The boiling range is from 300 to 3

Flooding and channeling in packed tower, Explain the problems of flooding a...

Explain the problems of flooding and channeling in packed tower

Explain soft-baking, Soft-Baking Soft-baking is the step during which a...

Soft-Baking Soft-baking is the step during which almost all of the solvents are separate from the photo resist coating. Soft-baking plays a very critical role in photo-imaging.

Chemical Bond, Where we have strong bond:ch20 ,h20,n20 and why?

Where we have strong bond:ch20 ,h20,n20 and why?

Introduction to aspects of electrical maintenance, INTRODUCTION : Earlier ...

INTRODUCTION : Earlier in this course you have read about the requirements of laboratories. You also know that these requirements can be for consumable and non consumable nature

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd