Petroleum Production.., Other Engineering

Assignment Help:
1. . Using the graph of pore/fracture pressure for the Holly Field propose a casing
scheme for the well using the graphical approach. Discuss the suitability of the
selected casing setting depths in relation to the lithology. The wellhead has
three hangers and the final hole size is 81/2".

2.From the information supplied on the graph select a suitable BHA to drill the
final 8 1/2" hole. ( Hint- start by determining a suitable WOB)
Assume 5", 21.87 lb. /ft. drill pipe and determine the value of the suspended
tension load at the top of drill pipe.

will provide the graph for question 2 if you can do it

Related Discussions:- Petroleum Production..

Lock Clip Came out from Rear Brake Drum (Backplate) , A type of brake used ...

A type of brake used to keep the vehicle from rolling when it is parked. The standard Parking brake locks the rear wheels to keep the car from moving. Parking brake cable is fixed

Identify people at risk - fire risk assessment, Identify people at risk: ...

Identify people at risk: It is often easy to forget that there may be people in a building who cannot move as quickly as the rest of us.  They may be in a wheel chair, they ma

Who is a more senior creditor, Who is a more senior creditor, a bondholder ...

Who is a more senior creditor, a bondholder or stockholder?  The bondholder is always more mature. Stockholders (including those who own recommended stock) must delay until bond

New assembly buildings - fire protection engineering, N e w Assembly Buil...

N e w Assembly Buildings: 12.1.1.1 The requirements of this chapter shall apply to new buildings or portions thereof used as an assembly occupancy. 12.1.3.2 Simultaneous

Pov display, require help in making pov display

require help in making pov display

Propeller track, PROPELLER TRACK An out of track propeller will suffer ...

PROPELLER TRACK An out of track propeller will suffer an imbalance caused by the Dynamic and Aerodynamic being out of balance. Propeller track is the path followed by a blad

DPC IN CIVIL ENGINEERING, I WANT TO KNOW WHAT IS DPC TERM MEANING IN CIVIL...

I WANT TO KNOW WHAT IS DPC TERM MEANING IN CIVIL ENGINEERING

Duct with flow control-aircraft maintenance, Duct With Flow Control-Aircraf...

Duct With Flow Control-Aircraft maintenance: BERNOULLI'S THEOREM This theorem can be related to the relationship between pressure and velocity existing in the air flowing

Bjt, why we use h for bjt

why we use h for bjt

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd