Objectives of Motion Study:
1. Combine relative activities.
2. Increases the efficiency of activities.
3. Reduce physical fatigue.
4. Eliminate as many unnecessary motions as possible.
5. Change the sequence of activities.
6. Improve the layout of the work place.
7. Improve the materials handling process.
8. Make the activity more safes.
9. Improve the design of tools fixtures jigs and equipment.
10. Standardize the optimum procedures and working conditions so that the employees uniformly use the best possible way of performing activity.
11. Improve the existing product design or invent a new design .
What do you understand by “line balancing”? What happens if balance doesn’t exist?
What does the term product positioning refer to? A careful analysis of cross tabulations Shelf locations in major chain, grocery, and department stores Geographic segmenta
The production manager must determine the processing sequence for 7 jobs through the grinding and debarring departments. The same sequence will be followed in both departments. The
Discuss the similarities and differences among the organization, group, and job levels in open systems theory.
Question: a) What is a strategy? b) Describe what is meant by a franchise. c) Henry Fayol put forward 6 primary functions of management. State the 6 functions and brief
Differences and similarities between marketing plan, strategic marketing plan and tactical marketing plan
What strategies should be considered if a small business is setting prices for a product that is to be exported? How are these strategies different from those used in a domestic ma
Disney entered Europe with several incorrect assumptions and poor research. Identify the problems that arose and how Disney should adjust for the immediate situation and what shoul
Carpet city recorded the following data on carpet instalations over th past week. Use the data to calculate the average rate (in yards per hour) at which carpet can be installed
Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd