It is one of the classic methods of evaluating the investment project. Here each potential projects value is find out its net present value (NPV). This method considers the time value of money and should that cash flow arising at different time differ in value, hence need to find out its present value (Robert Parrino & David s. Kidwell, 2009).
Steps involved in the calculation NPV:
• Find out the cash inflow from a project based on realistic assumption.
• Determine the appropriate discounted rate.
• Calculate the present value of cash inflow based on discounted rate.
• Net present value is calculated by deducting present value of cash outflow from the present inflow (I.M. Pandey, 2005).
Accept Reject rule:
Accept the project if NPV is positive NPV>0
Reject the project if NPV is negative NPV<0 (Robert Parrino & David s. Kidwell, 2009).
Merits of NPV:
• The value of money is considered.
• NPV considers cash flow occurring in the life of the project to calculate its worth.
• This method considers discounting rate to calculate present value of cash flow.
• This method considers the objective of maximizing shareholders wealth (I.M. Pandey, 2005).
Demerits to NPV:
• Difficult to forecast future cash flow as future is uncertain.
• If right discount rate is not considered then it leads to wrong investment decisions.
• It is not suitable when alternative projects with unequal lives exist (I.M. Pandey, 2005).

Related Discussions:- Net present value method: npv, finance

Earth Summit, please tell me in detail that what is earth summit??????????

please tell me in detail that what is earth summit??????????

Life cycle of a product from raw materials, The Task: This project is a...

The Task: This project is a 50% of the whole assessment of the course. You are required to assess a life cycle of a product from raw materials, through the supply chain, manufa

New assembly buildings - fire protection engineering, N e w Assembly Buil...

N e w Assembly Buildings: 12.1.1.1 The requirements of this chapter shall apply to new buildings or portions thereof used as an assembly occupancy. 12.1.3.2 Simultaneous

Accelerated Slipstream, Does the accelerated slipstream create more lift on...

Does the accelerated slipstream create more lift on part of a wing behind the propeller of a multa-engine aircraft? If so, about how much % for an Air King b200? Also the V-22 O

Manufacturing process, why is it necessary for all engieers to about manufa...

why is it necessary for all engieers to about manufacturing process

Inspection checklist, Inspection Checklist: The following checklist is...

Inspection Checklist: The following checklist is a starting point and it may be added to if subsequent inspections and debriefs indicate that this would be beneficial.   It sh

Technical Paper, I need help summarizing a technical paper.

I need help summarizing a technical paper.

Decision table software engineering, Write a decision table that specifies ...

Write a decision table that specifies the rules for the game of checkers.

Flight control - state feedback, If all states are measured by appropriate ...

If all states are measured by appropriate sensors and interfaced to the flight control computer then allthe states may be fed back and there is no restriction on the choice of K. S

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd