Q. Module Site Installation Preparation?

The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles:

After module support piles have been installed, the cap plate of each pile shall be surveyed to determine the top elevation of the cap plate when flat shim plates are used. Survey each corner of the cap plates when tapered shims are used. Refer to the construction drawings as appropriate, for various site conditions.

The ground between the piles shall be cleared of debris and the entire area shall be levelled as required to suite the placement of module either by crawler, RTVs and/or crane. The Project Site construction support shall obtain from logistics the area and elevation of the ground that needs levelling. In many instances an area in front of RTV or crawler setting the modules must also be levelled.


Related Discussions:- Module site installation preparation

Boiler, what is boiler. give all things about boiler. 1 specifica 2 mountin...

what is boiler. give all things about boiler. 1 specifica 2 mounting 3 acessories 4 advantages 5 maintinance

Calculate strength coefficient - true stress and true strain, Calculate str...

Calculate strength coefficient: A copper specimen of 64 mm gauge length and 12.80 mm dia. was tested in tension. Following two diameters were recorded in the plastic range of

Stresses and strains in bars of varying sections, a concrete column of 350m...

a concrete column of 350mm diameter is reinforced with 4 bars of 25mm diameter . find the stress when the concrete is subjected to a stress of 4.5 MPa . also find the safe load in

Group technology, comparing the different coding systems ?

comparing the different coding systems ?

Determine product data exchange specifications, Product Data Exchange Speci...

Product Data Exchange Specifications (PDES) By 1984, many of these international efforts had produced enough results to be compared, and an international community was preparin

GOVERNORS, Explain Wilson HArtnell Governor

Explain Wilson HArtnell Governor

Asset utilization, Asset Utilization: The data listed in Tables 1 and ...

Asset Utilization: The data listed in Tables 1 and 2 provide information about M/S Forge Private Limited. Table: Annual Balance Sheet with Partial Information

Enumerate about the loading conditions, Loading Conditions Non-uniformi...

Loading Conditions Non-uniformity of loading has to be considered in the choice of foundations particularly in highly compressible soils. It is not uncommon for buildings with

Evaluate the temperature of the centre of the bar, A copper bar 80 mm by 60...

A copper bar 80 mm by 60 mm in cross-section (k = 370 W/m ºC) is lying in a insulated trough so that the heat transfer from one face both the edges is negligible. It is seen that w

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd