Q. Module Site Installation Preparation?
The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles:
After module support piles have been installed, the cap plate of each pile shall be surveyed to determine the top elevation of the cap plate when flat shim plates are used. Survey each corner of the cap plates when tapered shims are used. Refer to the construction drawings as appropriate, for various site conditions.
The ground between the piles shall be cleared of debris and the entire area shall be levelled as required to suite the placement of module either by crawler, RTVs and/or crane. The Project Site construction support shall obtain from logistics the area and elevation of the ground that needs levelling. In many instances an area in front of RTV or crawler setting the modules must also be levelled.
Hi there could I please get a quote for the attached Electrical assignment please. Particular attention needs to be taken in terms of the instructions
Clutch cable routing : Ensure that the cable is routed as per standard routing, through the brackets provided.
Explain about the Raft Foundations The raft foundations are generally used for large loaded area on soils of low bearing capacity. They are of particular use when soils are of
Design a soda vending machine that can deliver three kinds of soda, A, B and C. All the three soda cost the same amount - 70 cents. The vending machine has four coin slots, one eac
Determine the stress in composite bar: How do you determine the stress in composite bar? What is Modular Ratio? Sol.: It becomes essential to have a compound tie or strut
A triangle ABC with vertices A (30,20), B(90,20), C(30,80) is to be scaled by a factor of 0.5 about a point X(50,40). Calculate :- (i) The composite transformation matrix; and
Functions of the Piston Ring To form a seal for high pressure gases from the combustion chamber, against leak into the crankcase. To provide sufficient lubricating oi
I need a formula to calculate the offset that would give me
Determine the width and depth of the beam: A timber beam of rectangular section is only supported over a span of 5 m. It carries an uniformly distributed load of 15 kN/m over
A Common Cell Control Software In this section, fine and common implemented cell control software are developed, that is based upon a transition table, to show the restriction
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd