Mining, Other Engineering

Assignment Help:
Students are to undertake a tunnel blast design for the following conditions:
• Tunnel is 5.5m wide by 5.5.m high
• Rock is a granite with a UCS of 300 MPa
• Drill hole diameter is 51 mm, hole length is 4m
• The cut is to contain 2 relief holes of 75mm diameter
• Dry conditions are anticipated, ANFO to be used with a density of 800 kg/m3 and a powder factor of 0.6 kg/m3
• Nonel detonators are to be used
Students are to determine:
1. The design of the cut, including burden and spacing for each element of the cut.
2. Burden and spacing of the easer, perimeter and lifer holes
3. Stemming length required
4. Method of hole priming
5. Firing sequence timings for the holes
6. Explosive utilisation
Results should be presented in a report format, including diagram s as required and details of calculations undertaken.

Related Discussions:- Mining

Model independent option valuation , Derive the functional relationship bet...

Derive the functional relationship between the no-arbitrage values of the two vertical spreads, C (K1)-C (K2) and C (K2)-C (K3).

Avionic systems design- stability derivatives, The idea of stability deriva...

The idea of stability derivatives is to approximate the general functional relationship between any force ormoment variable and the dynamic or control variables as a Taylor series

Pressure filter - aircraft maintenance , PRESSURE FILTER The pressure o...

PRESSURE FILTER The pressure oil filter housing contains a wire-wound or mesh, Paper or felt elements and incorporates a by-pass valve. The filter housing can be drained inde

P d c, what are clippers

what are clippers

Polymers, what are the merits and demerits of free radical

what are the merits and demerits of free radical

Isdn, Explain the meaning of numbering and addressing in ISDN network.

Explain the meaning of numbering and addressing in ISDN network.

Qualitative risk assessment - fire protection engineering, Qualitative risk...

Qualitative risk assessment - fire protection engineering: NFPA 551 discusses the differences between qualitative risk assessment and quantitative risk assessment. Qualitat

Weighted average cost of capital, Using this link and the information there...

Using this link and the information therein ( http://www.sec.gov/Archives/edgar/data/1110452/000119312507151600/d20f.htm#tx19738_13.) find Air France’s weighted average cost of ca

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd