Metrics followed in project management, DOT NET Programming

Assignment Help:

What are the metrics followed in project management?

The most metric sets deal with a variation of these attributes and are chosen to help the project managers gain insight into their product (software quality, size,  rework), process (software quality, rework ) &  project (schedule, effort).

But below is a broader classification:-

1)      Project Management Metrics:

(i) Milestone metrics

  • number of milestones
  • number of proved requirements per milestone
  • controlling level metrics

(ii) Risk metrics

o   The Probability of resources availability

o   The Probability of the requirements validity

o   The risk indicators (long schedules, inadequate cost estimating, unanticipated acceptance criteria, excessive paperwork, error-prone modules, cost overruns, canceled projects, excessive schedule pressure, low quality, creeping user requirements, excessive time to market, unused or unusable software, hidden errors)

o   The application risk metrics

(iii) Workflow metrics

  • walkthrough metrics
  • traceability metrics
  • variance metrics

(iv) Controlling metrics

  • Size of control elements
  • Structure of control elements
  • Documentation level
  • Tool application level

(v) Management database metrics

  • data quality metrics
  • management data complexity
  • data handling level (performance metrics)
  • visualization level
  • safety and security metrics

2)      Quality Management Metrics:

(i)Customer satisfaction metrics

  • characteristics size metrics
  • characteristics structure metrics
  • empirical evaluation metrics
  • data presentation metrics

(ii) Review metrics

  • number of reviews in the process
  • review level metrics
  • review dependence metrics
  • review structure metrics
  • review resources metrics

(iii) Productivity metrics

  • actual vs. planned metrics
  • performance metrics
  • productivity vs. quality metrics

(iv) Efficiency metrics

  • time behavior metrics
  • resources behavior metrics
  • actual vs. Planned metrics

(v) quality assurance metrics

  • quality evaluation metrics
  • error prevention metrics
  • measurement level
  • data analysis metrics

3)      Configuration Management Metrics:

(i) change control metrics

  • size of change
  • dependencies of changes
  • change interval metrics
  • revisions metrics

(ii)  Version control metrics

  • number of versions
  • number of versions per customer
  • version differences metrics
  • releases metrics (version architecture)
  • data handling level

Related Discussions:- Metrics followed in project management

How do we connect to sql server ?, How do we connect to SQL SERVER, which n...

How do we connect to SQL SERVER, which namespace do we use ? The code is shown below, after that i will  give the explanation for it. For this sample we will also require a SQL

A bot and php command panel, Deat Sir/Madam, I need a small software .NET2...

Deat Sir/Madam, I need a small software .NET2.0 in C# That search for files by - name - extension - part of the name (contains) - file created before a date provided This search

What are abstract classes, What are abstract classes? What are the distinct...

What are abstract classes? What are the distinct characteristics of an abstract class? An abstract class is a class that cannot be instantiated and is always used as a base cla

How can you add rows from the datatable object of dataset, How can you add ...

How can you add or remove rows from the DataTable object of DataSet? The DataRowCollection class explains the collection of rows for the DataTable object in a DataSet. The Data

Different types of DOT NET programming, Could you please explain to me the ...

Could you please explain to me the different types of DOT NET programming

I need complete erp solution of jeweler manufacturing, I need Complete ERP ...

I need Complete ERP Solution of Jeweler Manufacturing Project Description: MY Project Have Complete ERP Solution of jewellary manufacturing Process. By Using of my software y

Acid fundamental and transactions in sql server, What is ACID fundamental? ...

What is ACID fundamental? What are transactions in SQL SERVER? The transaction is a sequence of operations performed as a single logical unit of work..The logical unit of work

Difference between "web farms" and "web garden", What is the difference bet...

What is the difference between "Web farms" and "Web garden"? The "Web farms" are used to have some redundancy to reduce the failures. It consists of two or more web server of t

Android to pc communications via bluetooth, Project Description: I am lo...

Project Description: I am looking an app that mimics this app presently available here [justremotephone.com]. It has a nice set of features but also lacks a lot when it comes to

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd