Meaning of driving succession of driven piles, Civil Engineering

Assignment Help:

Question

What is meaning of driving succession of driven piles?


Answer

In Basement construction, if piles are driven from centre to perimeter, there is a propensity of soils to move away from. Such lateral group of soil might cause break to nearby structures and utilities.

Though, if piles are driven from outside perimeter inwards, there are slight soil lateral movements. These results in a well-compacted core with an excess pore water pressure built up to resist loading of piles. So, shorter pile lengths than original designed ones might result. Still, some time after pile driving operation, excess pore water stress is dissipated and shorter driven piles might not be able to take up the original design loads. In this state redriving is required to drive piles to deeper depths after indulgence of excess pore water pressure.

 


Related Discussions:- Meaning of driving succession of driven piles

Comparison of pre and post-tensioning, Comparison of pre and post-tensionin...

Comparison of pre and post-tensioning A comparison between pre-tensioned and post-tensioned concrete members can be made on the basis of the following considerations. (a) T

How to calculate the coefficient of permeability, The discharge of water co...

The discharge of water collected from a constant head permeameter in a period of 15 minutes is 500 ml. The internal diameter of the permeameter is 5 cm and the measured difference

Importance of general and subsidiary rules, Q. What is the importance of Ge...

Q. What is the importance of General and subsidiary rules. What is the main differences between the two. Ans.- Importance of General and subsidiary  rules - General and su

Determine the statement about construction earthwork, Which of the followin...

Which of the following statements about construction earthwork are true: I.  The volume of earth known in its natural state is known as bank-measure; in-situ; in-place; virgin

Determine the thickness of flexible pavement layer, Determine the thickness...

Determine the thickness of flexible pavement layer 2 given the following:  FACTS: Total Structural Number required = 7.0 Total number of layers = 2 Layer 1 consists of

Hydaurlics : pelton and francis turbine, what are the factors which influen...

what are the factors which influence the efficiency of the turbine?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd