State the Problem and phases of site investigation The site investigation is to be performed to obtain the solution for the following problems: i) Foundation problems ii
Bituminous Concrete: Bituminous Concrete (BC) is a hot-mix superior type of bituminous surfacing, having a low voids (3-5 per cent), good durability high imperviousness and g
Assignment for marketing mix
On-line storage vs. off-line storage Design of storage pond is commonly divided into off -line storage and on-line storage. The on-line storage concept includes inclusion of s
Q. Show Afflux and scour in alluvial rivers? In case of alluvial rivers, the river bed comprises scourable material like sand. Constriction of bridge waterway causes increase
what is a casement in civil technology
What is the purpose of the gap in the road on this bridge? Ans) Purpose of the gap in the road is to permit the road to expand and contract with temperature alters without causi
Q. Diffrence between Hudsons and Van der Meer formula? Hudson's formula is usually adopted in preliminary design to attain rough initial estimate of rock size. This formula is
Q. ACSR (Aluminium Conductor Steel Reinforced) are utilized as (A) over head transmission lines. (B) super conductors. (C) fuse
does felid scope in civil eng. if we start consiltancy job
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd