Maintenance of water bound macadam roads, Civil Engineering

Assignment Help:

Maintenance of Water Bound Macadam Roads:

The maintenance of water bound macadam surface consists of :

  • filling potholes, ruts with additional material and adequately compacting.
  • removing corrugations by dragging.
  • repairing lavelled surface (in which loose aggregates appear on the road) by adding fresh binding material, watering and compacting.
  • restoring broken edges by fresh material.
  • renewal of surface (50-75 mm) once in 2-6 years depending upon traffic.

 


Related Discussions:- Maintenance of water bound macadam roads

Softening test point, the importance of softening point of a bitumen materi...

the importance of softening point of a bitumen material in the design of a pavement

Spatial structures loading, Spatial Structures Loading Dead load D...

Spatial Structures Loading Dead load Dead loads include the weight of permanent components such as elements and spheres weight, casing weight, false ceiling weight and uti

Mini projcts in diaster management.., any new innovative metods to protct b...

any new innovative metods to protct building from disater

Building, individual wall methods benefits?

individual wall methods benefits?

Define overloading - deterioration in steel, Define Overloading - Deteriora...

Define Overloading - Deterioration in Steel? Steel structural elements are sensitive to impact damage from moving vessels and other types of accidental overloading. Impact or c

Amount of water that added to achieve the optimum moisture, Geotechnical pr...

Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction.   The field moisture test finds that fi

Roof truss, The angle between the members at the joint is 30°. Design the ...

The angle between the members at the joint is 30°. Design the members at the joint. Design also the connection of the members at the joint. The length of the principal rafter betw

Water hammer, how can Simulink calculate wave speed of water hammer

how can Simulink calculate wave speed of water hammer

Quality of constraction material ., haw to control quality of constraction...

haw to control quality of constraction material and it''s stage of control, control management, quality of performance ,organization for control

Evlaute width and depth for stable alluvial canals, Q. Evlaute width and de...

Q. Evlaute width and depth for stable alluvial canals? Lacey originally evolved width and depth formulae for stable alluvial canals. These were the following.  P = 4.836 Q 1

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd