The load data given in Table 1 belongs to a power company. Develop the daily load curve for the primary feeder. Also, determine:
a. maximum coincident demand of the system
b. demand factor if the feeders total connected load is 4MW
c. utilisation factor, if the feeders rated capacity is 5MW
d. load factor
e. diversity factor
f. coincidence factor
g. load diversity
h. loss factor
Table 1: Daily load curve data for question 1
Time Load(kW)
Residential Commercial Lights
00:00 250 300 100
01:00 250 300 100
02:00 250 300 100
03:00 250 300 100
04:00 250 300 100
05:00 250 300 100
06:00 250 300 100
07:00 350 300
08:00 450 400
09:00 550 600
10:00 550 1100
11:00 550 1100
12:00 600 1100
13:00 600 1100
14:00 600 1300
15:00 600 1300
16:00 600 1300
17:00 650 1300
18:00 750 900
19:00 900 500
20:00 1100 500 100
21:00 1100 500 100
22:00 900 300 100
23:00 700 300 100
24:00 250 300 100


Related Discussions:- Load flow studies from power generation and distribu, engineering

Dsp, Dit fft idft

Dit fft idft

Presintering, Presintering is an operation in which the powder metallurgy ...

Presintering is an operation in which the powder metallurgy components after compaction are heated for a short time to a temperature considerably below the final sintering tempera

Lifting wing, Lifting wing FP was run at the conditions corresponding t...

Lifting wing FP was run at the conditions corresponding to AGARD WG07 TEST CASE 11, namely M∞ = 0.84,α= 3.06 deg. The ‘final step' values of the partially-conservative paramete

The compression after impact test, This Compression After Impact (CAI) test...

This Compression After Impact (CAI) test fixture was developed by the Boeing Company. The specimen, typically, but not necessarily, a quasi-isotropic laminate, is 6" long, 4" wide,

Sprinkler system - fire protection engineering, Sprinkler system - fire pro...

Sprinkler system - fire protection engineering Sprinkler systems may be installed in a building to achieve a number of different objectives.  Very often the primary reason for

Mine Surveying.., Question 1 (100 marks) As Surveyor in charge of an underg...

Question 1 (100 marks) As Surveyor in charge of an underground mine you have been instructed to design a tunnel to join a crosscut to a haulage drive. The details of the crosscut a

Geology, write and explain the different geophysical methods

write and explain the different geophysical methods

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd