A PAPER MILL PRODUCES TWO GRADES OF PAPER VIZ., X AND Y. BECAUSE OF RAW
MATERIAL RESTRICTIONS, IT CANNOT PRODUCE MORE THAN 400 TONS OF GRADE X PAPER
AND 300 TONS OF GRADE Y PAPER IN A WEEK. THERE ARE 160 PRODUCTION HOURS IN A
WEEK. IT REQUIRES 0.20 AND 0.40 HOURS TO PRODUCE A TON OF GRADE X AND Y PAPERS.
THE MILL EARNS A PROFIT OF RS. 200 AND RS. 500 PER TON OF GRADE X AND Y PAPER
RESPECTIVELY. FORMULATE THIS AS A LINEAR PROGRAMMING PROBLEM.

Related Discussions:- linear programming

Regression equations - correlation regression analysis, Regression Equation...

Regression Equations The   regression equations express the regression line. As there are two regression lines so there  are two  regression  equations. The regression equatio

A paper mill, A paper mill products two grade of paper viz., X & Y. Because...

A paper mill products two grade of paper viz., X & Y. Because of raw material restriction, it cannot produce more than 400 tons of grade X paper & 300 tons of grade Y paper in a we

What is the temperature of water leaving the chillier, A water chillier wit...

A water chillier with a capacity of 30 TR cools 20 m 3 /hr. water entering at 12 o C what is the temp. of water leaving the chillier. A reversible engine has an ideal thermal ef

Z-test - hypothesis testing, Z-Test Prof. Fisher has  given a method  of...

Z-Test Prof. Fisher has  given a method  of testing the significance of the correlation coefficient in small  samples. According  to this method the  coefficient of correlation

North west corner rule, North West Corner Rule for Initial Solution: Now ...

North West Corner Rule for Initial Solution: Now by applying North West corner rule we can initial solution. According to this rule without regard to cost consideration the

Linear Programming , A Paper mill produces two grades of paper viz. X and ...

A Paper mill produces two grades of paper viz. X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper in

Word problems based on formulation of linear programming, Word problems bas...

Word problems based on formulation of linear programming problems. 2.   A manufacturer produces nuts and bolts for industrial machinery. It takes 1 hour of work on machine 1 an

Cross cultural communication in the workplace, This assignment requires you...

This assignment requires you to carry out the first part of a research project on the topic of "Cross cultural communication in the workplace". You can take any approach to this to

Level of significance - hypothesis testing , Level of Significance I...

Level of Significance In testing a given  hypothesis  the maximum  probability with which  we would  be willing  to take  risk is called  level of  significance of the  test.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd