Q. Leak Repair Torquing Procedure?

Attempt to tighten only the bolts contained within an arc that includes the leak area plus one or two bolts either side of the leak to the original torque values. A criss-cross torquing sequence should be used. If the leak does not stop, repeat the torquing procedure using increments of 50 ft-lbs. (68 N-m) up to the maximum over torquing value.

If the bolts cannot be tightened, the stud bolts contained in the arc of the leak shall be removed one at a time and cleaned or replaced if damaged. Lubricate the bolts and reinstall. Torque the bolts to the full torque value. Follow the same torquing sequence as above. Repeat the sequence using increments of 50 ft-lbs. (68 N-m) up to the maximum over torquing value.

If no results are achieved, go to the bolt on the flange directly opposite to the center of the leak, loosen it and retighten it to its proper torque. Ten, working one bolt at a time on opposite sides of the first bolt, readjust all the bolts on the side of the flange opposite the leak. It may be necessary to repeat this operation to get even bolt loading. When this operation is complete, go back to the bolt in the center of the leak and retighten as outlined above.

If these procedures are still not successful in stopping the leak, consider using hot/cold setting compounds with special enclosures or taking the piping system out of service for permanent repair.


Related Discussions:- Leak repair torquing procedure

Master production schedule, Master Production Schedule: A manufacturin...

Master Production Schedule: A manufacturing unit produces two products M and N on generates to stock basis. The estimated demand for the product M and N over the next six week

What do you mean by thermodynamic equilibrium, What do you mean by thermody...

What do you mean by thermodynamic equilibrium? Compare irreversible process with reversible process. Give some examples of irreversible process.

Data and tasks - rough-cut capacity planning, Expected quarterly sales in Y...

Expected quarterly sales in Year 1 (vehicles) The work content of a single unit of each product in each process has been estimated at: Using MS-Excel, calculate the workloads

Explain Machining allowance, Can you show us - Overall length of external s...

Can you show us - Overall length of external surfaces, cm In image Material Cast Overall length of external surfaces, cm 0 to 30 30 to 60 60 to 105 1

Scheduling, how to find out hte optimal sequence and determine the minimun ...

how to find out hte optimal sequence and determine the minimun total elapsed time associated with a given problem

Thermodynamics, define the first and second law of thermodynamics.

define the first and second law of thermodynamics.

Counter flow and parallel flow heat exchange, What is the difference betwee...

What is the difference between counter flow and parallel flow Heat exchange. Classify Heat exchange on the basis of constructional features and design.

Fms, fms computer control system

fms computer control system

Stress, how do i determine the operational factor of safety in tension

how do i determine the operational factor of safety in tension

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd