Q. Leak Repair Torquing Procedure?
Attempt to tighten only the bolts contained within an arc that includes the leak area plus one or two bolts either side of the leak to the original torque values. A criss-cross torquing sequence should be used. If the leak does not stop, repeat the torquing procedure using increments of 50 ft-lbs. (68 N-m) up to the maximum over torquing value.
If the bolts cannot be tightened, the stud bolts contained in the arc of the leak shall be removed one at a time and cleaned or replaced if damaged. Lubricate the bolts and reinstall. Torque the bolts to the full torque value. Follow the same torquing sequence as above. Repeat the sequence using increments of 50 ft-lbs. (68 N-m) up to the maximum over torquing value.
If no results are achieved, go to the bolt on the flange directly opposite to the center of the leak, loosen it and retighten it to its proper torque. Ten, working one bolt at a time on opposite sides of the first bolt, readjust all the bolts on the side of the flange opposite the leak. It may be necessary to repeat this operation to get even bolt loading. When this operation is complete, go back to the bolt in the center of the leak and retighten as outlined above.
If these procedures are still not successful in stopping the leak, consider using hot/cold setting compounds with special enclosures or taking the piping system out of service for permanent repair.
A "perfect" square (shown in dashed lines in the sketch below) with initial dimensions of 0.5 x 0.5 inch is drawn on the surface of a thin aluminum structure (E = 10x10 6 psi, v =
Components of power plant &it''s functions
Value engineering & Value analysis VA may be defined as looking at an existing product or a product already in production to see if changes in design or process can reduce prod
what are the necessery calculation required to design a gripper?
What is the relation between break point elasticity and Yield point elasticity.?
Various applications of numerical methods in the field of m=numerical engineering.
Rubber Hoses: Fuel or vacuum hoses should be installed so that end is bottomed into its fitting which would ensure adequate area for the hose clip to grip the hose beneath the fla
The second stage of the design process is to evaluate the oxygen requirement for the organism. This is necessary so that we can establish if the vessel we construct will be capable
example on operation sheet?
Stores for hazardous substances shall be segregated from, and located at a safe distance from accommodation spaces and control room. Indoor storage areas require access from an ope
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd