Q. Leak Repair Torquing Procedure?
Attempt to tighten only the bolts contained within an arc that includes the leak area plus one or two bolts either side of the leak to the original torque values. A criss-cross torquing sequence should be used. If the leak does not stop, repeat the torquing procedure using increments of 50 ft-lbs. (68 N-m) up to the maximum over torquing value.
If the bolts cannot be tightened, the stud bolts contained in the arc of the leak shall be removed one at a time and cleaned or replaced if damaged. Lubricate the bolts and reinstall. Torque the bolts to the full torque value. Follow the same torquing sequence as above. Repeat the sequence using increments of 50 ft-lbs. (68 N-m) up to the maximum over torquing value.
If no results are achieved, go to the bolt on the flange directly opposite to the center of the leak, loosen it and retighten it to its proper torque. Ten, working one bolt at a time on opposite sides of the first bolt, readjust all the bolts on the side of the flange opposite the leak. It may be necessary to repeat this operation to get even bolt loading. When this operation is complete, go back to the bolt in the center of the leak and retighten as outlined above.
If these procedures are still not successful in stopping the leak, consider using hot/cold setting compounds with special enclosures or taking the piping system out of service for permanent repair.
merits and demertis of v belt over flat belt
Q. Skid assemblies and modular structures? This specification describes parameters for the design, fabrication, materials and installation of the structural steel part of skid
Explain in detail about the Large excavations Large excavations required for construction of rafts may need dewatering, depending on the ground water flow and the choice of a
What is melting point of aluminium?
(a) Oil, with density ρ= 900 kg/m 3 , and kinematic viscosity υ=0.00001m 2 /s, flows at the rate of 0.2m 3 /s through 500m of a cast iron pipe of diameter d=200mm. Using this infor
Determine the process of modelling The process of modelling is much easier, if mathematical description of an object, or at least of part of an object may be applied. In the fi
Y ield stress and ultimate stress Yield stress: Yield stress can be defined as lowest stress at which extension of test piece increases without increase in the load. It is
Linear Sweep In linear sweep, the path is a linear or circular vector described by a linear, most often parametric. Linear sweep can be divided into translational and rotationa
What is tool economics?
Q. Show Construction Subcontractor Responsibilities? The Supplier or Construction Subcontractor is responsible for: • Employing qualified PMI technicians • Performing PMI
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd