Internal parts of boiler, Mechanical Engineering

Assignment Help:

Internal Parts of boiler:

Pressure Gauge:   For indicating steam pressure

Water Level Indicator: for indicating water level.

Steam Stop Valve: Permits flow of steam from boiler as and when desired.

Feed Check Valve: Permits flow of water to boiler.

Blow off Cock: For removing settlements collected at the bottom of boiler.

Manhole: Permits entering of operator or inspection staff.

Fusible Plug: For avoiding any explosion because of overheating.

Boiler Accessories: Auxiliary equipment for the efficient boiler operation.

Preheater: A heat exchanger which is used to heat air entering the boiler with waste flue gases . Economiser: A heat exchanger to heat feed water by means of outgoing flue gasses. Superheater: To super heat the steam which is coming from boiler.

BABCOCK & WILCOX BOILER:  It is horizontal, natural draught, stationary, externally fired, water tube boiler. It is high capacity boiler and can produce steam at a pressure of 4 Mpa at the rate of 40000 kg/hr.

 


Related Discussions:- Internal parts of boiler

What is, what is soundness of casting.

what is soundness of casting.

Stone slab culverts with abutments, Stone Slab Culverts with Abutments and ...

Stone Slab Culverts with Abutments and Piers: Where good quality stone slabs are available like granite slabs, they can be used for superstructure of culverts, with suitable

Reactions at point while the system is rotating, Reactions at point while t...

Reactions at point while the system is rotating: 8 kg ball is mounted on a horizontal bar associated to a vertical shaft. Neglecting the mass of the bar and shaft what are the

Frames, Introduction and conclusion on frames

Introduction and conclusion on frames

Computer control system in flexible manufacturing system, Computers control...

Computers control system in flexible manufacturing system

What is gust response factor, Q. What is Gust Response Factor? For flex...

Q. What is Gust Response Factor? For flexible structures such as a tall vertical process vessel, a Gust Response Factor, Gf is another essential variable needed to determine th

Schedule evaluation, Schedule Evaluation Each continuations of a partia...

Schedule Evaluation Each continuations of a partial schedule that are produced in step 1 are ranked as per to their respective cost function. This cost function might be dissim

Classification based on mode of welding, Classification Based on Mode of We...

Classification Based on Mode of Welding Manual welding: In this welding the entire welding operation is performed and controlled by hand. Here, there are two movements involv

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd