Intercepting Drains:
Intercepting drains, also known as catch-water drains, are provided in the uphill slope of hill roads to intercept the water and lead it to a natural water steam. A typical arrangement is shown in Figure.
Figure : Intercepting (Catch-water) Drain
Construction planning millennium miles
Question For a rigid pile cap with vertical piles at middle and raking piles at the sides, what is pattern of load distribution of piles in such agreement? Answer Becau
a lighthouse standing on the cliff observed from two open boats A and B in a vertical plane thourgh the lighthouse.the angle of elevation of the top of the lighthouse viewed from B
what is a bolder?
Explain Equations for a triangular (V-notch weir) Used for small flow rates. C 2 is a coefficient which varies from 0.58 to 0.61 depending upon the notch angle. Q = C
Design volume of the aeration basin - sewer construction: Problem: What is the design volume of the aeration basin? Solution Assuming that 30% of the plant influe
parabola by offset method
limitations of resistance
The following test results were obtained for a 100 ml wastewater sample taken at the inlet to wastewater treatment plant. The tests were performed using the standard methods. Dete
how to convert a varying distributed load to a uniformly distributed load
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd