Identify people at risk - fire risk assessment, Other Engineering

Assignment Help:

Identify people at risk:

It is often easy to forget that there may be people in a building who cannot move as quickly as the rest of us.  They may be in a wheel chair, they may simply have difficulty walking quickly, they may be young children or pregnant mothers, they may be blind or deaf, they may be asleep or they may be sedated awaiting some treatment.  It is always import to consider the people who are least able to get out of a building quickly.

 

 


Related Discussions:- Identify people at risk - fire risk assessment

Airflow control system principles-aircraft engine, Airflow control system p...

Airflow control system principles: For any given engine there is only one set of conditions, mass flow, pressure ratio and rpm, at which all the compressor components are opera

Clamper, what is clampers and how many types

what is clampers and how many types

How would undertake a waste audit, Question: a) Assume that you are the...

Question: a) Assume that you are the director of the Solid Waste Unit of the Ministry of Local Government. Explain how you would undertake a waste audit at the level of a munic

Net present value method: npv, Discounted cash flow methods Net present val...

Discounted cash flow methods Net present value method: NPV It is one of the classic methods of evaluating the investment project. Here each potential projects value is find out its

Capital structure - case study, The following is the capital structure of X...

The following is the capital structure of X ltd on 31st Dec2003

Zeroth law of thermodymanics, Explain with the aid of sketch of zeroth law ...

Explain with the aid of sketch of zeroth law of thermodynamics

Mining, Students are to undertake a tunnel blast design for the following c...

Students are to undertake a tunnel blast design for the following conditions: • Tunnel is 5.5m wide by 5.5.m high • Rock is a granite with a UCS of 300 MPa • Drill hole diameter is

Internal rate of return: multiple alternatives, Internal Rate of Return: Mu...

Internal Rate of Return: Multiple Alternatives To compare multiple alternatives using the IRR as measure of economic worth we must use the incremental approach. It is erroneou

Linear lateral dynamics, Linear lateral dynamics The second order (two ...

Linear lateral dynamics The second order (two degree of freedom) Dutch-Roll approximation is an approximation to the abovefourth order system for the Dutch Roll dynamics. A jus

Vectors or matrices matlab, Vectors or matrices MATLAB can make and ope...

Vectors or matrices MATLAB can make and operate arrays of 1 (vectors), 2 (matrices), or more measurements. In the MATLAB language, a vector represents a one perspective (1×N or

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd