Question:
a) Failures in software development would include excessive cost and/or schedule delays to never fielding a system. Briefly explain the risks associated with development teams, technology and requirements when developing software applications.
b) A Risk Treatment Plan (RTP) consists of all Events/Threats, which could affect a project or an organisation. An assessment of the risk is performed and countermeasures are identified.
How can a particular risk be assessed?
c) What are countermeasures and what are the objectives of implementing a countermeasure?
d) How does a countermeasure affect a project plan?
Explain Testability? Ans) (1) The degree to which a scheme or component facilitates the establishment of test criteria and the performance of tests to verify whether those crite
Differentiate between structured analysis and structured design. The aim of structured analysis is to transform the textual explanation of a problem into a graphic model. Duri
What is Class Level Methods? Ans) A class (and its operations) is the module mainly concentrated on in OO environments. From here it should increase to other classes and sets of
Explain the role and functions of a Systems Analyst in the overall project development.
What are 5 common problems in software development process? 1. Bad requirements - These requirements are unclear, too general, incomplete, or not testable. They cause problem
What is meant by System Requirements? Place the system services and constraints in detail. Serves as a link between the system purchaser & the system developer.
A walk-through is an informal meeting for informational purposes or evaluation.
Name the design phase of SDLC Generally, design is performed in the below two steps: i) Primary Design Phase: In this phase, system is designed at block level. Blocks are
I need help for my X86 Assembler program
Q. Assuming the Putnam model and given S = 100,000 C = 5000 and D 0 = 15 calculate the development time t d. Ans: In Putnam model (S/C ) 3 = D 0 t d 7 lhs = 20
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd