How can we use spiral model in large-scale systems, Software Engineering

Assignment Help:

Q. How can we use Spiral model in large-scale systems?

Spiral model is as well known as spiral life cycle model is the system development life cycle model utilized in information technology. This model of development merges the features of prototyping model as well as waterfall model. The spiral model is utilized for large and expensive and complicated project.

  • It Presented by BARRY BOHEM in late 1986 incorporating the project risk factor.
  • Designed in order to conquer the demerits of waterfall model.
  • The radial dimension represents the collective cost acquired in accomplishing the steps done therefore far as well as the angular dimension represents the progress made in completing every cycle of the spiral.
  • Every loop is a development stage.
  • Equilibrium all the risk elements that is the high-risk element should be lowered.
  • The people apprehensive with the project complete every phase with a review.

 


Related Discussions:- How can we use spiral model in large-scale systems

Define the prototyping model, Define the Prototyping Model In this mod...

Define the Prototyping Model In this model, a working model of actual software is developed originally. Prototype is just like a sample software having low reliability and les

Define process maturity, Define process maturity. In recent years there...

Define process maturity. In recent years there has been a important emphasis on process maturity. The Software Engineering Institute. (SEI) has developed a comprehensive model

What are the characteristics of srs, What are the characteristics of SRS? ...

What are the characteristics of SRS? i. Correct - The SRS should be made up to date when appropriate needs are identified. ii. Unambiguous - When the needs are correctly un

What are the benefits of smoke testing, What are the benefits of smoke test...

What are the benefits of smoke testing? Integration risk is minimized. The quality of the end-product is improved. Error diagnosis and correction are simplified. Asses

Activity and use case diagram, The Application You should develop your p...

The Application You should develop your program using incremental development. Develop your program a little bit at a time and keep testing it. Save a working version before mak

Assignment 2, I have to do an assignment. Can you help me to do it

I have to do an assignment. Can you help me to do it

What is throw-away prototyping, Throw-away prototyping Objective: ...

Throw-away prototyping Objective: The principal objective of this model is to validate or to derive the system needs. It is developed to decrease requirement risks.

State the level 5 of key process areas, Level 5 KPAs 1)Defect Prevent...

Level 5 KPAs 1)Defect Prevention (DP): It discovers causes of defects and devises techniques which prevent them from recurring. 2)Technology Change Management (TCM): It

Define coupling, Define coupling. Coupling is the measure of the degre...

Define coupling. Coupling is the measure of the degree of interdependence among modules.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd