How can we use spiral model in large-scale systems, Software Engineering

Assignment Help:

Q. How can we use Spiral model in large-scale systems?

Spiral model is as well known as spiral life cycle model is the system development life cycle model utilized in information technology. This model of development merges the features of prototyping model as well as waterfall model. The spiral model is utilized for large and expensive and complicated project.

  • It Presented by BARRY BOHEM in late 1986 incorporating the project risk factor.
  • Designed in order to conquer the demerits of waterfall model.
  • The radial dimension represents the collective cost acquired in accomplishing the steps done therefore far as well as the angular dimension represents the progress made in completing every cycle of the spiral.
  • Every loop is a development stage.
  • Equilibrium all the risk elements that is the high-risk element should be lowered.
  • The people apprehensive with the project complete every phase with a review.

 


Related Discussions:- How can we use spiral model in large-scale systems

What is requirement engineering, What is requirement engineering? Requ...

What is requirement engineering? Requirement engineering is the process of establishing the services that the customer needs from the system and the constraints under which it

Determine the cyclomatic complexity, Q. Consider the program given below ...

Q. Consider the program given below void main() { int i,j,k; readln (i,j,k); if( (i k) ) { writeln("then part"); if (j writeln ("j

What is common coupling, Q. What is Common coupling? Common coupling: ...

Q. What is Common coupling? Common coupling: With general coupling module A and module B have shared data. Global data areas are usually found in programming languages. Formu

The functional requirement for a library management system, Describe the fu...

Describe the functional requirement for a Library management system ?

Differences between programme managers and project managers, Question: ...

Question: (a) Differences between programme managers and project managers. (b) A small computer system controls the entry of vehicles to a car park. Each time a vehicle pu

Illustrate the introduction to flowcharts, Illustrate the Introduction to F...

Illustrate the Introduction to Flowcharts This mainly covers four areas: 1 Common flow chart symbols 2 Writing flowcharts to solve problems 3 Dry running of flowcharts

Explain the stages of rapid application development model, Question: a)...

Question: a) It has often been argued that Rapid Application Development results in small stand-alone systems running in isolation. Discuss. b) Rapid Application developmen

Explain product metrics, What is Product metrics? A quality metric shou...

What is Product metrics? A quality metric should be a predictor of product quality. Classes of product metric Dynamic metrics which are collected by measurements made

Explain about spiral model, Q. Explain about Spiral Model? The Spiral m...

Q. Explain about Spiral Model? The Spiral model is one of the well-liked model used for large projects. This model was projected by Boehm in 1988 and it focuses on minimizing t

What are the fundamental activities of a software process, What are the fun...

What are the fundamental activities of a software process? Specification Validation Design and implementation Evolution

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd