How and what data is gathered- Simulation

To make this as realistic as possible, data is required to be gathered over a long period of time. This can be done by sensors near/in the road, using cameras or manual data collection. Data gathered comprise:

 

-  count the number of vehicles passing in all directions at each junction .....

-  ..... At a particular time of day

-  count how many cars build up at a junction before lights change

-  is it a week day or bank holiday or weekend

-  How long it takes to clear vehicles at a junction

-  Other data (such as pedestrian crossings)

-  Time for largest/slowest vehicle to pass through a junction

-  Other factors (for example filtering of traffic to the right or left)

 


Related Discussions:- How and what data is gathered- simulation

Explain about the functionality of olap, Hyper cube or multidimensional cub...

Hyper cube or multidimensional cube forms the core of OLAP system. This having of measures which are arranged according to dimensions. Hyper cube Meta data is formed by star or sno

Data structure, Sort the following list using selection sort technique, dis...

Sort the following list using selection sort technique, displaying each step. 20,12,25,6,10,15,13

Can we run matlab without graphics, Sometimes you may need to run scripts w...

Sometimes you may need to run scripts which have plotting commands without displaying the plots and without going into the script to comment out the commands. An example: if you're

Perform subtraction in base 5 using r and r-1 complement, Q Write a menu dr...

Q Write a menu driven program to perform subtraction in base 5 using r and (r-1) complement with necessary validations.

Internet programming, Futoshiki is a game played on an N by N (usually 5 by...

Futoshiki is a game played on an N by N (usually 5 by 5) grid and uses the symbols 1 .. N. The objective of the game is to place each symbol on the grid so that it only occurs once

What is meant by Wired-AND connection of digital ICs, What is meant by Wire...

What is meant by Wired-AND connection of digital ICs?                                                                                                               Ans: Wir

Problem specification - logic programs, Problem Specification : Hence ...

Problem Specification : Hence given the above context for "ILP" there we can state the learning problem as follows: that we are given a set of positive and a set of negative e

Organisational inertia - obstacle to information system, Organisational Ine...

Organisational Inertia - Obstacle To Information System This is most easily understood as problems of change and culture. Like any change process technology led change will be

How the information should be retrieved from the database, In a report with...

In a report with an LDB attribute, you do not have to explain how the information should be retrieved from the database tables, but only how the data should be shown on the screen.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd