  • Each hazardous site must be examined and evaluated for its characteristics before workers are allowed entry. This will pre decide antihazard method and procedure.
  • Prior training on specific hazardous material must always be undertaken.
  • Besides engineering controls to restrict exposure risk the workers must use personal protective gear and equipment.
  • A site control programme must identify zonal plan, communication point, and station for medical assistance. Out of several inculcated work habits in hazardous environment teamwork must take precedence.
  • Periodical medical examination of workers handling hazardous
  • Waste material is required to be arranged.
  • The workers leaving the hazard filled space must follow decontamination procedure.
  • There must be contingency plans to deal with emergency situation in which coordination of all concerned department of the company and any outside agency must be ensured.
  • Air monitoring to measure hazardous material must be a routine practice.
  • The identities including names, official position and specialization of key personnel must be widely publicized among the workers dealing with such materials and situation.

Related Discussions:- Hazardous waste and material standards

Automobile, what is internal combustion engine

what is internal combustion engine

Determine the efficiency of bell coleman cycle, (a) Derive a mathematical e...

(a) Derive a mathematical expression to determine the efficiency of Bell Coleman Cycle. (b) A dense air refrigeration cycle acts between pressures of 4 bar and 16 bar. The air t

Support reaction and roller support, Support reaction: Explain the su...

Support reaction: Explain the support reaction? What are different types of support and their reactions? Sol.: When the numbers of forces are acting on a body, and the

Thermodynamics: Apple Hydrocooling Unit, Design a hydrocooling unit that ca...

Design a hydrocooling unit that can cool fruits and vegetables from 30 to 5 degrees Celsius at a rate of 20,000 kg/hr under the following conditions: The unit will be of flood typ

Define principal process for electron beam machining, Define Principal Proc...

Define Principal Process for Electron Beam Machining A beam of electrons is emitted from the electron gun which is basically following three points. 1. A cathode whic

MOTORSPORT VEHICLE CONSTRUCTION, MODIFICATIONS REQUIRE FOR A ROAD CAR TO EN...

MODIFICATIONS REQUIRE FOR A ROAD CAR TO ENTER A HILL CLIMB

Explain the creation phase of paver machine, Creation phase of Paver machin...

Creation phase of Paver machine: Objective: "To generate alternative methods for providing the function, through creative thinking, brainstorming and even speculation."

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd