Functions of water stops in joints of box culverts, Civil Engineering

Assignment Help:

Question
What will functions of water stops in joints of box culverts and drainage channels?

Answer
Principal function of water stops is to stop liquids, water-borne materials and solids to go through concrete joints. In essence, it plans at provided that water tightness to drainage channel.

Moreover, water stops in drainage channels or box culverts are able to also serve two reasons-
(i) To evade water contacting joints dowel bars and causing corrosion.
(ii) To evade water seeping in from underside of drainage channels or box culverts, thus washing in dirt particles and causing void under these structures and at last leading to their failure. To serve second purpose, clearly only one water stop is necessary at depth location.

To serve up first purpose, water stop has to be installed on pinnacle of dowel bars to stop water from drainage channels from leaking from side to side. On other hand, water stop has to be offered under dowel bars to keep away from secretive water from surging upwards.

In fact, other way out to serve first purpose is by using corrosion anti bars.

 


Related Discussions:- Functions of water stops in joints of box culverts

Explain plate jig, Explain Plate jig 1) The major parts of this jig is ...

Explain Plate jig 1) The major parts of this jig is plate from which it takes its name other necessary parts and drill bush and locating pins. 2) Plate jigs are general for

Define circular channels flowing partially full, Define Circular Channels F...

Define Circular Channels Flowing Partially Full Two sets of curved lines on the Circular Channel Ratios figure (discharge Q/Q full and velocity v/v full ).  1.  "n" variabl

Distinguish among active and passive earth pressure, Distinguish among  'ac...

Distinguish among  'active' and 'passive' earth pressure. Describe clearly Rebhann's graphical construction method to evaluate the earth pressure on a retaining wall. What are t

Importance of racking load for a pre-stressed concrete beam, Importance of ...

Importance of racking load for a pre-stressed concrete beam Evaluation of cracking load for a pre-stressed concrete beam member is important for the following cases/reasons.

State the moulds in prestressed concrete, State the Moulds in Prestressed C...

State the Moulds in Prestressed Concrete Moulds for pre-tension work should be sufficiently strong and rigid so that they can withstand the effects of placing and compacting th

Introduction to engineering mechanics, Deternim the angle A for which the m...

Deternim the angle A for which the moment of the 500N force is maximum about a point o. also find the maximum momentum

Calculate the change in volume, Calculate the change in volume: If the...

Calculate the change in volume: If the bar is 1 m long with rectangular cross section of 300 mm deep and 400 mm wide, compute the change in volume of the solid because of a lo

Determine the flow area of storm water, Storm water flows at a depth of 4 f...

Storm water flows at a depth of 4 ft in the natural channel as shown in the figure. The channel has a slope of 0.0l ft/ft and n = 0.025. 1. Determine the flow area:

Cement, List the ingredients of cement And their functions

List the ingredients of cement And their functions

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd