A framework has been developed and a set of core indicators for electricity Sector has been proposed. In the first example, mapping the main sources of data could follow the proposed framework and indicators as some of these will be readily available from open sources. Therefore, the data requires to be regularly updated and there does not seem to have a sustained effort at the level of the organization to do this.
The suggested KPIs could be adopted at National level along with a varying degree of benchmark. An atmosphere of accountability, measurement and improvement thus can be created that will provide benefit to electricity Distribution Sector with more satisfied customer. The Ministry of Power requires to give a requisite impetus to all the participating utilities to work upon to first monitor the KPIs, compare them internally and along with other utilities and to create an atmosphere of excellence along with a reward and penalty provision.
Economic regulation of utilities/ DISCOMs generally focuses on price regulation, with associative less attention to performance standards and social obligations. Instead, technical rules are not commonly concerned along with economic aspect and cost-efficiency. The linkage of economic and technical regulation after liberalisation presents a challenge for regulators. The existing norms are unsatisfactory; thus, it is quite necessary to move quickly towards international standards in stages.
Roadmaps for every stage are to be decided through regulators.
For the circuit in figure, find the current through each resistor.
why is a delay line used in the vertical selection of oscilloscope?
ERC and KPI The company requires understanding the strategic and nearing term impact of the Regulator's orders / tariff approval process. Once these dimensions are understood,
1. Sum of forces is zero velocity remains constant.[If the particle is initially at rest, it will remain at rest for as long as the sum of the forces is zero]. 2. Sum F of for
Q. Show Effects of Saliency and Saturation? Because of saliency, the reactancemeasured at the terminals of a salient-pole synchronousmachine as opposed to a cylindrical-rotor m
Q. Illustrate the basic working of Modem? Modem: Modems are generally provided by network operators or by vendors who aren't necessarily the manufacturers of computer systems.
Long-Term Plans for Technical Loss Reduction Long-term measures for technical loss reduction include all measures that require to be taken for the improvement of quality and r
Q. A filter is a network employed to select one range of frequencies while rejecting all other frequencies. A basic building block often used in integrated-circuit filters is shown
Find a minimum two level, multiple-output AND-OR gate circuit to realize these functions (eight gates minimum). F 1 (a,b,c,d) =Σm(10,11,12,15) +D (4,8,14) F 2 (a,b,c,d) =Σm(4
Why does digital signal processing require specialized hardware? A) It needs to perform analog as well as digital functions. B) General-purpose microprocessors cannot perfor
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd