Fire risk assessment process:

This is the main part of the FRA process.    Here we consider the risk, measure it against what we consider acceptable and, if we consider that the risk is too great, we make our recommendations for remedial actions that will reduce or eliminate the risk.

Our recommendations may be for preventative measures or may be for fire precautions

- i.e. those measures that will make the building safe even if there is a fire within it.

This element is about recording the findings and recording the remedial actions that are required to make the risk acceptable. It also mentions co-operating with others and training staff.

Finally, the process is not meant to be done once and then forgotten about.  It should be carried out regularly and reviewed every time that there are any changes to the building, the people in it, the contents in it or the processes that take place within it. The period between regular reviews varies according to the type of premises involved. In a low risk office the review might only be required every two or three years but in a high life risk shopping mall the review should be at least once per year.

 

 


Related Discussions:- Fire risk assessment process

Math problems solutions matlab, Matlab is a 4th technology selection langua...

Matlab is a 4th technology selection language, which is designed by The MathWorks. It provides an exact processing atmosphere. Matlab works a variety of math features like design o

Write a program to find the area under the curve y =, #questiWrite a progra...

#questiWrite a program to find the area under the curve y = f(x) between x = a and x = b, integrate y = f(x) between the limits of a and b. The area under a curve between two point

Interlaminar shear strength , Composites have low shear strengths compared ...

Composites have low shear strengths compared to longitudinal strengths. The ILSS test is a simple 3 point bend test, requiring a small amount of material. A span to depth ratio

Assignment Engineering Design 1, Prepare a list of questions that should be...

Prepare a list of questions that should be resolved in identifying each of the following problems: a. Develop an improved manual gearshift for a mountain bike. b. Develop a hands-f

Aeroengine - linear blade cascade, A blade cascade is a row of evenly space...

A blade cascade is a row of evenly space yp dentical blades. Approximates to a turbomachinery rotor or stator if the radius the annulus is large compared with the bl the annulus is

Inspection checklist, Inspection Checklist: The following checklist is...

Inspection Checklist: The following checklist is a starting point and it may be added to if subsequent inspections and debriefs indicate that this would be beneficial.   It sh

Means of escape, Means of escape: The means of escape can start at any...

Means of escape: The means of escape can start at any point inside a building where there may be people.      The means of escape end when 'ultimate safety' is attained out

Design structure matrix, what are the types of interactions in the design s...

what are the types of interactions in the design structure matrix?

Finanacial management, Why is it important for engineering students to have...

Why is it important for engineering students to have financial management as a subject?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd