Fire risk assessment process:

This is the main part of the FRA process.    Here we consider the risk, measure it against what we consider acceptable and, if we consider that the risk is too great, we make our recommendations for remedial actions that will reduce or eliminate the risk.

Our recommendations may be for preventative measures or may be for fire precautions

- i.e. those measures that will make the building safe even if there is a fire within it.

This element is about recording the findings and recording the remedial actions that are required to make the risk acceptable. It also mentions co-operating with others and training staff.

Finally, the process is not meant to be done once and then forgotten about.  It should be carried out regularly and reviewed every time that there are any changes to the building, the people in it, the contents in it or the processes that take place within it. The period between regular reviews varies according to the type of premises involved. In a low risk office the review might only be required every two or three years but in a high life risk shopping mall the review should be at least once per year.

 

 


Related Discussions:- Fire risk assessment process

Pneumatics, 3. Design and draw a circuit using the cascade system to operat...

3. Design and draw a circuit using the cascade system to operate two cylinders (A and B) which, on the operation of a start valve, produces the sequence A – B + B – A+. The cylinde

Function setxor and set function unique - set operations, Function setxor a...

Function setxor and set function unique: The function setxor receives two vectors as input arguments, and returns a vector having all the values from the two vectors which are

Accounting hep, Here are the budgets of Brandon Surgery Center for the mos...

Here are the budgets of Brandon Surgery Center for the most recent historical quarter (in thousands of dollars): Static Flexible Actual Number of surgeries 1,200 1,300 1,

Logic gate -xor gate, 'Exclusive or' gate: The basic OR gate illustrate...

'Exclusive or' gate: The basic OR gate illustrated previously in Figure 3 was seen to include the AND operation in that its output will adopt the 1 state not only when either i

Extended input facilities, Extended input facilities Another instance w...

Extended input facilities Another instance where multiple inputs to a single gate operation can occur is with certain types of gate elements that have an 'EXTENDED INPUT' facil

Propeller control in aircraft engine, Propeller control : CONSTANT SPE...

Propeller control : CONSTANT SPEED UNIT: In the normal flight range, the main control of the propeller is exercised by the propeller control unit (PCU). MANUAL AND AU

Identify people at risk - fire risk assessment, Identify people at risk: ...

Identify people at risk: It is often easy to forget that there may be people in a building who cannot move as quickly as the rest of us.  They may be in a wheel chair, they ma

Corporate finance, Firm A needs to purchase a new machine. If the machine i...

Firm A needs to purchase a new machine. If the machine is purchased, it will replace an old machine purchased 10 years ago for €105,000 and which is being depreciated on a straight

Vertical spread, What are the no-arbitrage lower bound, and the no-arbitrag...

What are the no-arbitrage lower bound, and the no-arbitrage upper bound, of the vertical spread

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd