Fire prevention - fire risk assessment, Other Engineering

Assignment Help:

Fire prevention - fire risk assessment:

Fire prevention measures include:

  • Reducing the combustible materials,
  • Reducing the risk of ignition,
  • Reducing accumulations of waste,
  • Controlling the use and storage of highly flammable materials,
  • Controlling any processes that produce heat,
  • Providing sprinklers or other suppression systems,
  • Providing extinguishers.

 


Related Discussions:- Fire prevention - fire risk assessment

Environmental engineering question, The town of Smog, Idaho is located in a...

The town of Smog, Idaho is located in a river valley and has a footprint of 6 km x 2 km. It has an average daily emission rate of 1000 kg/day of PM2.5 into the atmosphere from wood

Securities analysis coursework, Company: British Sky Broadcasting Topic: Yo...

Company: British Sky Broadcasting Topic: You are a security analyst in a large investment house and must write a report on a real stock of your choice, giving a buy, hold or sell r

Process of fire risk assessment in uk, Process of fire risk assessment: ...

Process of fire risk assessment: In the UK, the process for  the FRA came out of the process for a general risk assessment. In a general risk assessment hazards are identif

Ubiquitous networks, Ubiquitous network applications are generally designed...

Ubiquitous network applications are generally designed for a whole network. This notion should be reflected in the way a network is programmed. We believe that providing abstractio

Materials in design, I have assignments to due and I''m wondering if you co...

I have assignments to due and I''m wondering if you could do it for me

Engineering economic analysis definition, Introduction Engineering Econ...

Introduction Engineering Economic Analysis Definition: using a combination of quantitative and qualitative techniques to analyze economic differences among engineering design a

Calculate the maximum amount of recoverable resource, A 30m deep quarry pit...

A 30m deep quarry pit is to be constructed in a jointed basalt rock mass. The quarry management wants to maximise the side wall inclination to 70° for economic reasons. The geologi

Barometric lag, My question is that i am working in a petrochemical plant w...

My question is that i am working in a petrochemical plant where in final stage disc ring reactor the barometric lag is chocked completely the system is under vacuum if i introduce

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd