Explain the reuse maintenance model, Software Engineering

Assignment Help:

Explain the reuse maintenance model with the help of a diagram.

Reuse maintenance model: This model is based on the principal  that maintenance could be viewed as an activity involving the reuse. of  existing program components. 

The reuse model has four main steps: 

1. Identification of the parts of the old system that are candidates for reuse.

2. Understanding these system parts.

3. Modification of the Old system parts appropriate to the new requirements.

4. Integration of the modified parts into the new system. 

With the five reuse model, the starting point may be any phase of the life cycle. The requirements, the design, the code or the test data :- unlike other  

 

2207_11.png


Related Discussions:- Explain the reuse maintenance model

Calculate capacity of a cluster for this disc, A multiplattered HDD is for...

A multiplattered HDD is formatted into twenty sectors and 16 hundred cylinders. There are eight platters and 16 R/W heads. The total capacity of the disc is 1GB. A cluster of data

Oop, create a class rectangle

create a class rectangle

Various attributes of cost drivers used in cocomo model, Various attributes...

Various attributes of cost drivers used in COCOMO model are: 1.  Physical attributes: These are concerned with needed characteristics of the software product being developed.

Draw an entity-relationship model, (a) Draw an Entity-Relationship model f...

(a) Draw an Entity-Relationship model for the relational schema given in the Appendix. Show all the entities, relationships, relationship names, and attributes and also underline

Explain the software scope, Define software scope. The first software p...

Define software scope. The first software project management activity is the determination of software scope. Scope is defined answering the following questions. Context: Wh

What is stochastic testing, Stochastic testing is the similar as "monkey te...

Stochastic testing is the similar as "monkey testing", but stochastic testing is a lot more technical sounding name for the similar testing process.

Explain requirement issues in software risks, Q. Draw the flow chart of Ris...

Q. Draw the flow chart of Risk Management-Activity and explain various Software risks. Ans RISK is a problem that could cause a few loss or threatens the success of the proje

Software requirements specification, A Software Requirements Specification...

A Software Requirements Specification (SRS) is a complete description of the behavior of the system to be developed. It includes a set of use cases, describing the interactions

Explain the steps used in in system analysis, Question 1 A) If you are a s...

Question 1 A) If you are a software engineer you must be expert in the field of hardware, software  and also database. It has been listed by the industry professionals that time a

Managing variability, 1.    McM Cog is a supplier of industrial parts.  Mos...

1.    McM Cog is a supplier of industrial parts.  Most orders are received at a call center. The call center currently has 10 phone lines total, i.e., a maximum of 10 callers may b

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd