Explain the Per-action modeof QTP

- Best used in below cases:

- When creating simple record and run tests when there is just one or very few tests which correspond to interface, objects or application

- When test object properties will not be modified every now and then

- When creating single-action tests.

 

 


Related Discussions:- Explain the per-action modeof QTP

Explain diffrent types of system testing, Q. Explain diffrent types of syst...

Q. Explain diffrent types of system testing? System testing System tests are designed to validate a fully developed system to assure that it meets its requirements. There are f

Why is quality assurance difficult in software engineering, Question: (...

Question: (a) Why is quality assurance especially difficult in software engineering ? (b) Inspiring yourself from the McCall's taxonomy of quality attributes, explain five

What is the meaning of real time system, What is the meaning of Real time s...

What is the meaning of Real time system? Real time system is a software system where the correct functionalities of the system are dependent upon results evaluated by the syste

What is a software project test plan, What is a software project test plan?...

What is a software project test plan? A test plan is the master document that having all details pertaining to testing of the application. Its contents include: - Testing sc

Stats free, system architecture block diagram

system architecture block diagram

Explain change control, Problem 1 Explain change control? Write down th...

Problem 1 Explain change control? Write down the steps followed for change control Problem 2 Explain the concept of Baselines with reference to software configuration m

Define the method of direct changeover, Define the method of Direct changeo...

Define the method of Direct changeover With this technique, old system is stopped and new system is used Straight away;  - This method can be disastrous if new system fails

Calculate the peak manning and average rate of software, Q. A software proj...

Q. A software project is planned to cost 95PY in a period of 1 year and 9 months. Calculate the peak manning and average rate of software them build up. Ans. Software project

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd