Explain the Design Criteria Sedimentation basin
Surface Loading rate (or overflow rate), Vo = Q/A (flow rate/surface area)
Detention time t or ? = V/Q (Volume /Flow rate)
Weir loading = Q/L (flow rate/length of weir) ≤ 20,000 gpd/ft
Minimum depth 10 ft and Free Board = 1- 2ft
Width 30-50 ft and length 100-200 ft with a L:W of 3:1 to 5:1 (4:1 typical) for rectangular basins and diameter of less than 200 ft for circular tanks.
What are the problems in under water concreting?
Q. Indirect tensile strength in water-retaining structures ? Crack width formation is dependent on the early tensile strength of concrete. Principle of critical steel ratio als
Q. Can you explain Curved heads ? In case of rivers carrying high discharges of the order of 28300 m 3 Is and above, Gale's recommendations are more conservative than Spring's
A trapezoidal masonry retaining wall 1 m wide at top and 3 m wide at its bottom is 4 m high. The vertical face is retaining soil (φ = 30°) at a surcharge angle of 20° with the hori
A load of 3000 kN is being taken by a square column footing. Side of the column is 3 m, footing rests on a silty soil with a Poisson's ratio = 0.3. Modulus of elasticity of the soi
Maintenance of Water Bound Macadam Roads: The maintenance of water bound macadam surface consists of : filling potholes, ruts with additional material and adequately c
State the Loss of prestress Loss of prestress due to elastic shortening definitely occurs in pre-tensioned concrete members. But in post-tensioned members it does not occur if
State the importance of structural element If this structural element is used as a beam element, subjected to self load and other imposed transverse loads, then the bottom fibr
Question While designing lateral resistance of piles , have to engineers only use earth pressure against pile caps simply? Answer In case of designing lateral loa
Explain the Modular Incinerators 1. Prefabricated units with capacities of 4.5 to 107 tons of solid waste/day 2. Most use a system involving two combustion chambers.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd