Q. Explain Lines of code - Software Metrics?
Lines of code (LOC) is a software metric used to measure the size of a software program by counting the number of lines in the text of the program's source code. LOC is typically used to predict the amount of effort that will be required to develop a program as well as to estimate programming productivity or effort once the software is produced. Advantages:-
1. Scope for Automation of Counting: Since Line of Code is a physical entity; manual counting effort can be easily eliminated by automating the counting process. Small utilities possibly developed for counting the LOC in a program. Nevertheless a code counting utility developed for a specific language cannot be used for other languages due to the syntactical and structural differences among languages.
2. An Intuitive Metric: Line of Code serves as an intuitive metric for measuring the size of software due to the fact that it can be seen and the effect of it can be visualized. Function Point is additional of an objective metric which cannot be imagined as being a physical entity it exists only in the logical space. This way LOC comes in useful to express the size of software among programmers with low levels of experience.
Explain virtual memory? Ans) Virtual memory tells to virtual storage. In virtual storage, portions of a user's program and data are placed in auxiliary storage, and the operatin
Q. Explain Predictive validity? Predictive validity: It is the potential of the model to predict future failure behaviour from present and past failure behaviour. This capabi
Check mail from for assignment. Are you kidding with me. What kind of code you sent. Did you even execute before sending. It has error. Either do it as per the assignment or
1.1 Discuss possible ramifications of these opposing objectives on the project. What would you do if you were the manager?
Explain the term- Phased In this approach only part of the new system is introduced and only when it proves to work satisfactorily is the next part introduced and so on, unti
Define Brooks law. Software was delivered late, was defective, cost several times the original estimates and often showed poor performance characteristics.
Explain the Phased Waterfall Model It is a type of waterfall model where the project is separated into small phases and delivered at intervals by dissimilar teams. Different Te
What does it mean by business process engineering tools ?
of elicitation methods
Draw E-R diagram for the following situation An account is a relationship between customer and bank. A customer has a name. A bank has a branch. A customer may have numerous ac
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd