Explain the Damage inspections - underwater inspection of bridge?
Sometimes referred to as post-event inspections, damage inspections are typically unscheduled inspections aimed at rapidly assessing the stability of a structure in the event of structural damage resulting from environmental or man inflicted causes.
The scope of inspection can vary substantially by the type and severity of event. Inspection must be sufficient to determine the need for emergency load restriction or closure of bridge to traffic and to assess the level of effort necessary to repair the damage. If measurable damage has occurred, inspections must evaluate section loss, misalignment of members, and loss of foundation support if any.
The exciting force in a constant force type of excitation was 120 kN. The natural frequency of the machine foundation is 4 Hz. The damping factor is 0.36. Verify the magnificati
In case of simple bending after simply supported beam, derive that M/I = s /y = E/R.
Q. Explain the Maximum spacing of piles? One of the factors which affect the distribution of loads from the structures to each pile is assumption of flexibility of the pile ca
The problem in the link below. ">http://www.expertsmind.com/questions/plot-vertical-displacement-cantilever-beam-30134382.aspx#
Explain the Critical Flow Critical flow occurs where the flow depth is at the critical depth. One location in an open channel is where the flow is approaching a free outfall.
whether the wall has adequate sliding resistance
im looking for someone to do drawing in autocad 3D 2013 with report
Explain the Bernoulli Energy Equation Accounts for the fluid energy at any point in a fluid flow system. Units are in ft. Developed for energy without friction. The total energ
When a dam is to be built, a diversion tunnel is usually bored by solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows by the
Water Absorption Test: In this test cube specimen weighing approximate 50 grams are prepared and the test is carried out in the steps following: 1. Note down the weigh
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd