ENMIN5018, Other Engineering

Assignment Help:
Design a detailed surface mine excavation plan.
Detail development requirements.
Detail Production requirements including a full description of the method selected.
Number of production units required/rate of production/other scheduling.
Describe loading/haulage requirements
Equipment
Processing
Personnel
Safety
Briefly describe power & drainage requirements
As well as any other salient points as required by the mining system, for economic analysis use current market prices in A$ for the commodity as required. Accurate costing is not an essential aspect to the project but some notional economic modelling is required to illustrate the viability of the method detailed.
State and justify all assumptions.
Gold-silver mineralisation in the deposit is hosted by an epithermal quartz vein system, which developed in a sequence of hydrothermally altered quartz-bearing andesite’s of Miocene age. Gold occurs as electrum (a gold-silver alloy) and is generally very fine grained. The steeply dipping vein system extends over 1,600 metres of strike length. Pervasive oxidation centred on the larger veins extends to a depth of about 200 metres.
This ore resource has been estimated to be approximately 11.25 million tonnes at 3.3 grams per tonne gold and 26 grams per tonne silver; equivalent to approximately 1,200,000 ounces of gold and 9.6 million ounces of silver.
The final pit will have approximate dimensions of 860 metres long by 600 metres wide at the original surface by 250 metres deep. The original surface has a fairly flat topography with minimal cover of topsoil and subsoil (10m or less). Typically, the waste rock consists of a thick sequence of volcanic lavas, breccia’s and tuff’s of generally andesitic composition as such geomechanically these are classed as reasonably competent rocks.
Ore is delivered to the processing plant; the processing plant has a planned output of up to a maximum of 1.25 million tonnes per annum.
The climate of the area is similar to that of Ballarat.

Related Discussions:- ENMIN5018

Java , why we need EJB

why we need EJB

Fire risk assessment process, Fire risk assessment process: This is th...

Fire risk assessment process: This is the main part of the FRA process.    Here we consider the risk, measure it against what we consider acceptable and, if we consider that t

Logic gate - nand gate, NAND Gate; When constructing a NAND gate using ...

NAND Gate; When constructing a NAND gate using transistors as the switching devices, the output often represents the 'inversion' of the "AND" gate. Figure 4 shows an example o

Detect the percolation by GUI Matlab, the percolation should be visualize ,...

the percolation should be visualize , and the path of the sphere also. i wanna see the relationship between the number of sphere & the percolation . change the # of sphere and show

HOmework, Assume that a movie is two hours long, that the frame rate is 30 ...

Assume that a movie is two hours long, that the frame rate is 30 frames per second, and that the resolution per frame is 1080i (1920×1080 pixels per frame), and that each pixel is

Switching, name the switching schemes used in a digital exchange. how call ...

name the switching schemes used in a digital exchange. how call processing takes place?

Crystal lattice of bcc, Q. Explain crystal lattice of BCC, FCC and HCP. ...

Q. Explain crystal lattice of BCC, FCC and HCP. Ans. (a) BCC (Body centered cubic): Body centered cubic structure, the unit cell, we observe in addition to the atoms at eight

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd