Efficiency Test on Sand Blasting:
After the study on sand blasting, the result was acceptable and the next step is planning to make order for new machine and search for vendors to quote. Before this, we had done several more repeated tests to ensure the result of sand blasting able to remove all fine burrs and did not damage any cutting edge of blade. Below figure shown that the great achieve result we had obtained from above sand blasting experiment.
As a result of this, we had decided to remove brushing process in production by implementing sand blasting method as a replacement of deburring process.
Induction Pressure Welding In this process, the current is induced by high frequency induction process in the job. Due to electrical induction the job is heated. When a suitabl
The Mechanical Engineer/Specialist shall be responsible for coordinating project issues related to stress analysis, as they relate to his/her equipment, with the Stress Engineer/Sp
(a) Calculate the unit step time response for a system with pulse transfer function (b) Calculate the pulse transfer function of a unity feedback discrete time system with
Frames: You have been introduced to the analysis of frames. By going through this unit, you may identify frames and differentiate them from trusses. The method for analyzing f
Find out the thickness of the metal and the hoop stress: The cylinder of a hydraulic press has an internal diameter of 0.3 m & is to be designed to withstand a pressure of 10
Construct a plain scale: The distance between Indore and Bhopal is 180 kilometer. It is represented on the map via 9 centimeter. Construct a plain scale for such map, illustra
sir, you are doing such a great thing.but my suggestion is that please u put some engineering problems to solve. for engineering student like me.
Schedule Evaluation The schedules are evaluated as per to the criterion weighted loss of slack. Now let t 0 si be the slack (time buffer) of job I as per to the initial sched
kennedy''s theorem
epicyclic train dynamometer working.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd