Dynamics of electrical machines, Electrical Engineering

Assignment Help:

1. Modeling of Armature and Field Controlled DC motors: Steady state and dynamic models; development of block diagrams;  assumptions used; complexity involved in realistic models; various solid-state controls.

Each student is required to develop the dynamic model of a separately excited dc motor (with armature and field controlled provisions) to investigate the dynamic/transient performances of the motor under various operating conditions. He/she is also required to select a suitable motor with appropriate numerical parameters for simulation studies.

2. Simulation: Implement the dynamic model developed in step 1  in MATLAB/SIMULINK or any other suitable simulation software to obtain  the dynamic/transient responses under following conditions:

(a) Starting (no-load and load conditions)

(b) Sudden change (increase/decrease) in load torque

(c) Voltage dips for a short duration

(d) Armature voltage control operation

(e) Field control operation

The purpose of the task is to give students an opportunity to develop modeling and simulation skills required in dealing with dynamic performance of dc machines. The deliverables of the task are the dynamic responses of the motor  (such as  current, speed, torque, etc.)  for various conditions with critical analysis. The  abnormalities (especially in armature current)  observed  during simulations should also be discussed with the suggestions of possible remedies.

The report of  the  assessment  must have the following format: title, abstract, list of contents, introduction, main body with numerical results and graphical illustrations, conclusions, references and an appendix which must include the source code for the simulation programs or the MATLAB/SIMULINK diagram.


Related Discussions:- Dynamics of electrical machines

Circuit symbols for mosfet, Circuit Symbols for MOSFET A range of symb...

Circuit Symbols for MOSFET A range of symbols are employed for the MOSFET. The basic design is usually a line for the channel along with the source and drain leaving it at rig

Find the t-domain forced response in glc parallel circuit, Consider a GLC p...

Consider a GLC parallel circuit excited by i(t) = Ie st in the time domain. Assume no initial inductive current or capacitive voltage at t = 0. Draw the transformed network in the

Show the procedure of octal to decimal conversion, Q. Show the procedure of...

Q. Show the procedure of Octal to Decimal Conversion? To convert from Octal to Decimal, multiply the value in every position by its Octal weight and add each value. Using the v

For parity flag - return instructions , For Parity Flag PRE ( Return ...

For Parity Flag PRE ( Return on Parity Even)  and RPO ( Return on Parity Odd) Instructions RPE returns from the  subroutine to the  calling  program if parity flag is not s

Control systems, Hi, What is the time response for a closed loop transfer f...

Hi, What is the time response for a closed loop transfer function:H(s) = 10/(s^2 +s +1) to delta function input?

Design an electro-pneumatic system, (i) Sketch a fully-labelled electro-pne...

(i) Sketch a fully-labelled electro-pneumatic circuit showing your actuators in the START position and employ metered out speed control with mono-stable 5/2 DCV's having solenoid a

State the advantages of expert systems, State the Advantages of expert syst...

State the Advantages of expert systems -  Never "forgets" to ask a question in determining the logic -  provides consistent answers - Less skilled work force needed, ther

Ldax load accumulator indirect instruction , LDAX  Load Accumulator Indire...

LDAX  Load Accumulator Indirect Instruction This instruction is used to copy data  from memory  location pointed by register  pair only  BC or DE  to the accumulator  HL pair

Cro, Ask question #Minimum 100 words accepteddelay line in cro#

Ask question #Minimum 100 words accepteddelay line in cro#

Guidelines from electricity regulatory commission, Guidelines from Electric...

Guidelines from Electricity Regulatory Commission The electricity companies have successfully adopted the guidelines issued through ERCs Utilities usually set their yearly KP

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd