You are the newly appointed assistant administrator at a local hospital, and your first project is to investigate the quality of the patient meals put out by the food-service department. You conducted a 10-day survey by submitting a simple questionnaire to the 400 patients with each meal, asking that they simply check off either that the meal was satisfactory or unsatisfactory. For simplicity in this problem, assume that the response was 1,000 returned questionnaires from the 1,200 meals each day. The results ran as follows:

Date in December # of Unsatisfactory Meals Sample Size

1 74 1,000

2 42 1,000

3 64 1,000

4 80 1,000

5 40 1,000

6 50 1,000

7 65 1,000

8 70 1,000

9 40 1,000

10 75 1,000

Total 600 10,000


A. Construct a p-chart based on the questionnaire results, using a confidence interval of 95.4 percent, which is two standard deviations.

B. What comments can you make about the results of the survey?

 


Related Discussions:- Draw a p-chart based on the questionnaire results

Explain what is economic value added, Spencer Inc. has the following inform...

Spencer Inc. has the following information for the current year: Net income = $600; Net operating profit after taxes (NOPAT) = $500; Total assets = $4,000; Short-term investments =

General advice must a public relations professional consider, What general ...

What general advice should a public relations professional consider in working with a lawyer?

Explain women understand the importance of behaving similar, The program, "...

The program, "Bully Broads" is designed to help Answer men understand the controlling nature of women. Women understand how their perception of what it takes to get ahead can be vi

Describe disadvantages of each of these approaches, McDonalds traditional p...

McDonalds traditional process to make-to-stock; Wendy's has a make-to-order and burger king has a process which is a hybrid of the other two. Discuss the advantages and disadvantag

Suitability of continuous or flow production, Suitability of continuous or ...

Suitability of continuous or flow Production In order that flow methods can operations satisfactorily a number of requirements must be met: 1.There Must be Substantially cons

What kind of transmission path does a fixed wireless signal, What type of t...

What type of transmission path does a fixed wireless signal require?

Explain the first step in the process is idle, A bottleneck is an operation...

A bottleneck is an operation that has the lowest effective capacity of any operation in the process. TRUE/FALSE. Write 'T' if the statement is true and 'F' if the statement i

List few of the strategic issues in supply chain management, The importance...

The importance of Supply Chain Management cannot be underestimated because it ensures that the right materials are at the right place at the right time at a minimal cost and maximu

OR, Explain OR Models

Explain OR Models

Explain geographic structure, When and under what conditions might managers...

When and under what conditions might managers change from a functional to A) a product structure B) geographic structure or C) a market structure? Give real-life examples of such a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd